Cantitate/Preț
Produs

Accelerated Bridge Construction: Best Practices and Techniques

Autor Mohiuddin Ali Khan
en Limba Engleză Paperback – 12 aug 2014
The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction or reconstruction operations while minimizing project delays and community disruption.


  • Describes design methods for accelerated bridge substructure construction; reducing foundation construction time and methods by using pile bents
  • Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition
  • Covers design-build systems' boon to ABC; development of software; use of fiber reinforced polymer (FRP)
  • Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joints details; use of lightweight aggregate concrete, aluminum and high-performance steel
Citește tot Restrânge

Preț: 56189 lei

Preț vechi: 61745 lei
-9% Nou

Puncte Express: 843

Preț estimativ în valută:
10754 11345$ 8962£

Carte tipărită la comandă

Livrare economică 26 decembrie 24 - 09 ianuarie 25

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9780124072244
ISBN-10: 0124072240
Pagini: 656
Dimensiuni: 191 x 235 x 30 mm
Greutate: 1.25 kg
Ediția:New.
Editura: ELSEVIER SCIENCE

Public țintă

Construction Engineers, Construction managers, Architects, and Architectural and civil drafters

Cuprins

SECTION 1 INNOVATIVE CONSTRUCTION METHODSChapter 1 Introduction to Modern Accelerated Bridge Construction (ABC)Chapter 2 Recent Developments in ABC Concepts Chapter 3 Research and Training in ABC Structural Systems Chapter 4 Innovative ABC Techniques
SECTION 2 RAPID CONSTRUCTION ISSUESChapter 5 Modular Bridge Construction Issues Chapter 6 Rapid Bridge Insertions Following FailuresChapter 7 ABC Planning and Resolving ABC Issues
SECTION 3 MODULAR BRIDGESChapter 8 Prefabrication of the SuperstructureChapter 9 Prefabrication of the Substructure And Construction IssuesChapter 10 Alternative ABC Methods and Funding Evaluation Chapter 11 A Review of Chapters, River Bridges and Conclusions