Accelerated Bridge Construction: Best Practices and Techniques
Autor Mohiuddin Ali Khanen Limba Engleză Paperback – 12 aug 2014
- Describes design methods for accelerated bridge substructure construction; reducing foundation construction time and methods by using pile bents
- Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition
- Covers design-build systems' boon to ABC; development of software; use of fiber reinforced polymer (FRP)
- Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joints details; use of lightweight aggregate concrete, aluminum and high-performance steel
Preț: 564.27 lei
Preț vechi: 620.08 lei
-9% Nou
Puncte Express: 846
Preț estimativ în valută:
107.99€ • 112.17$ • 89.70£
107.99€ • 112.17$ • 89.70£
Carte tipărită la comandă
Livrare economică 27 ianuarie-10 februarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780124072244
ISBN-10: 0124072240
Pagini: 656
Dimensiuni: 191 x 235 x 30 mm
Greutate: 1.25 kg
Ediția:New.
Editura: ELSEVIER SCIENCE
ISBN-10: 0124072240
Pagini: 656
Dimensiuni: 191 x 235 x 30 mm
Greutate: 1.25 kg
Ediția:New.
Editura: ELSEVIER SCIENCE
Public țintă
Construction Engineers, Construction managers, Architects, and Architectural and civil draftersCuprins
SECTION 1 INNOVATIVE CONSTRUCTION METHODSChapter 1 Introduction to Modern Accelerated Bridge Construction (ABC)Chapter 2 Recent Developments in ABC Concepts Chapter 3 Research and Training in ABC Structural Systems Chapter 4 Innovative ABC Techniques
SECTION 2 RAPID CONSTRUCTION ISSUESChapter 5 Modular Bridge Construction Issues Chapter 6 Rapid Bridge Insertions Following FailuresChapter 7 ABC Planning and Resolving ABC Issues
SECTION 3 MODULAR BRIDGESChapter 8 Prefabrication of the SuperstructureChapter 9 Prefabrication of the Substructure And Construction IssuesChapter 10 Alternative ABC Methods and Funding Evaluation Chapter 11 A Review of Chapters, River Bridges and Conclusions
SECTION 2 RAPID CONSTRUCTION ISSUESChapter 5 Modular Bridge Construction Issues Chapter 6 Rapid Bridge Insertions Following FailuresChapter 7 ABC Planning and Resolving ABC Issues
SECTION 3 MODULAR BRIDGESChapter 8 Prefabrication of the SuperstructureChapter 9 Prefabrication of the Substructure And Construction IssuesChapter 10 Alternative ABC Methods and Funding Evaluation Chapter 11 A Review of Chapters, River Bridges and Conclusions