Cantitate/Preț
Produs

Analysis of Construction Project Delays and Cost Overruns


en Limba Engleză Paperback
The books takes a holistic picture of construction projects delays and cost overruns by examining real projects. The major causes of project delays and cost overruns have been identified on the basis of questionnaire survey from the major stakeholders, including contractors, designers, sponsors and project managers. The analysis has revealed that cost increases, time delays and poor quality are three major concerns in the construction projects of Higher Education Sector of Pakistan. In the economic analysis, the delayed part of the projects has been analyzed on the basis of actual costs from the real time cost data. The Construction Price Index has been calculated on the basis of increases in the costs of delayed items of work. The book is recommended for the graduate students of Construction and Project management. It is also useful for the undergraduate students to develop their perceptions about the project management. For the students in Pakistan, the book can provide valuable information about the factors leading to project delays and cost overruns of construction projects
Citește tot Restrânge

Preț: 39501 lei

Nou

Puncte Express: 593

Preț estimativ în valută:
7558 7913$ 6254£

Tipărit la comandă

Livrare economică 08-22 aprilie

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9783639713275
ISBN-10: 3639713273
Pagini: 120
Dimensiuni: 152 x 229 x 7 mm
Greutate: 0.19 kg
Editura: Scholars' Press

Notă biografică

Dr. Attaullah Shah is a researcher, teacher and professional in the fields of Civil Engineering, Construction Management and sustanability. He is Director Projects at Allama Iqbal Open University Pakistan. He is the author of more than 60 publication in peer reviewed international journals and conferences. His areas of interest include HPC, shear..