Cantitate/Preț
Produs

Apartheid’s Leviathan: Electricity and the Power of Technological Ambivalence: New African Histories

Autor Faeeza Ballim
en Limba Engleză Paperback – 25 apr 2023
A fascinating study that shows how the intersection of technology and politics has shaped South African history since the 1960s. This book details the development of an interconnected technological system of a coal mine and of the Matimba and Medupi power stations in the Waterberg, a rural region of South Africa near the country’s border with Botswana. South Africa’s state steel manufacturing corporation, Iscor, which has since been privatized, developed a coal mine in the region in the 1970s. This set the stage for the national electricity provider, Eskom, to build coal-fueled power stations in the Waterberg. Faeeza Ballim follows the development of these technological systems from the late 1960s, a period of heightened repression as the apartheid government attempted to realize its vision of racial segregation, to the deeply fraught construction of the Medupi power station in postapartheid South Africa. The Medupi power station was planned toward the end of the first decade of the twenty-first century as a measure to alleviate the country’s electricity shortage, but the continued delay of its completion and the escalation of its costs meant that it failed to realize those ambitions while public frustration and electricity outages grew. By tracing this story, this book highlights the importance of technology to our understanding of South African history. This characterization challenges the idea that the technological state corporations were proxies for the apartheid government and highlights that their activities in the Waterberg did not necessarily accord with the government’s strategic purposes. While a part of the broader national modernization project under apartheid, they also set the stage for worker solidarity and trade union organization in the Waterberg and elsewhere in the country. This book also argues that the state corporations, their technology, and their engineers enjoyed ambivalent relationships with the governments of their time, relationships that can be characterized as both autonomous and immersive. In the era of democracy, while Eskom has been caught up in government corruption—a major scourge to the fortunes of South Africa—it has also retained a degree of organizational autonomy and offered a degree of resistance to those who sought to further corruption. The examination of the workings of these technological systems, and the state corporations responsible for them, complicates conventional understandings of the transition from the authoritarian rule of apartheid to democratic South Africa, which coincided with the transition from state-led development to neoliberalism. This book is an indispensable case study on the workings of industrial and political power in Africa and beyond.
Citește tot Restrânge

Din seria New African Histories

Preț: 21337 lei

Nou

Puncte Express: 320

Preț estimativ în valută:
4085 4246$ 3387£

Carte disponibilă

Livrare economică 16-30 ianuarie 25
Livrare express 01-07 ianuarie 25 pentru 1876 lei

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9780821425183
ISBN-10: 0821425188
Pagini: 176
Ilustrații: 1
Dimensiuni: 152 x 229 x 15 mm
Greutate: 0.2 kg
Editura: Ohio University Press
Colecția Ohio University Press
Seria New African Histories


Recenzii

“A fascinating and timely study of South Africa’s state corporations—in particular its national electricity provider Eskom—and their relationship to the (post)apartheid state. Drawing on meticulous historical research, Ballim powerfully revises existing accounts of state power in South Africa and speaks to urgent questions of energy politics and democratization in the present.”—Antina von Schnitzler, author of Democracy's Infrastructure: Techno-Politics and Protest after Apartheid

“The inevitable intertwining of power supply, politics and the market has been well explored. Yet in policy debates, one continues to hear calls for the separation of the three parts of the assemblage. Ballim takes up the issue in South Africa and captivatingly shows how calls for disentanglement obscure better insights.”—Richard Rottenburg, University of the Witwatersrand

Notă biografică

Faeeza Ballim (she/her) is a senior lecturer and head of the history department at the University of Johannesburg. She has previously published on agricultural cooperatives and urban racial segregation in the small town of Mokopane in the Limpopo province of South Africa. She is also currently the coeditor of a five-volume series entitled Translating Technology in Africa. Her research interests cohere around science and technology studies and its relationship to African history, and her new research is in the development of artificial intelligence technology in Africa.

Cuprins

Introduction Chapter 1 The Unlikely Exploitation of the Waterberg Chapter 2 The Taming of the Waterberg Chapter 3 Eskom and the Turning of the Tide Chapter 4 Contested Neoliberalism Chapter 5 Labor and Belonging in Lephalale Chapter 6 The Medupi Power Station Conclusion Notes Bibliography Index

Descriere

Beginning in the 1960s, the security of electricity supply has shaped South Africa’s economic growth and prosperity, and electricity shortages have negatively inflected the rise of its postapartheid democracy. Construction delays and escalating costs have thwarted the nation’s mining, manufacturing, and power generation.