Construction Contracts
Autor Edward Whitticksen Limba Engleză Paperback – 30 noi 2005
Preț: 487.62 lei
Preț vechi: 561.51 lei
-13% Nou
Puncte Express: 731
Preț estimativ în valută:
93.32€ • 96.94$ • 77.52£
93.32€ • 96.94$ • 77.52£
Carte tipărită la comandă
Livrare economică 27 ianuarie-10 februarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780976511359
ISBN-10: 0976511355
Pagini: 305
Ilustrații: tables & charts
Dimensiuni: 156 x 234 x 22 mm
Greutate: 0.51 kg
Editura: ELSEVIER SCIENCE
ISBN-10: 0976511355
Pagini: 305
Ilustrații: tables & charts
Dimensiuni: 156 x 234 x 22 mm
Greutate: 0.51 kg
Editura: ELSEVIER SCIENCE
Cuprins
Preface
Chapter 1: Client Policy and Practice
1.1 Introduction
1.2 The Fundamental Contract Document
1.3 Invitations to Bid
1.4 Lump Sum Contracting Preferred
1.5 Lump Sum Plus Unit Rates
1.6 Unit Rate Only
1.7 Reimbursable Cost Contracts Where Necessary
1.8 Cost Plus a Percentage Fee
1.9 Start Cost Reimbursable with Later Conversion to Lump Sum
1.10 Provisional Contract Price Agreement
1.11 Target Cost (Shared Overrun or Underrun)
1.12 Partnering
1.13 Prime Contracts
1.14 Professional Services Contracts
1.15 Short Form Contracts
1.16 Incentive Plans
1.17 Policy on Claims
1.18 Quality and “Intent of Contracts
1.19 Field Administration of Contracts
1.20 Planning Policies
1.21 Integration
1.22 Governmental Policies and Influences–The “Third Party
Chapter 2: The Bid Package
2.1 Preparation by the Client’s Team
2.2 Errors and Omissions
2.3 What Type of Contract?
2.4 Job Explanation Meeting
2.5 Site Visit
2.6 Bid Package Worksheets
Chapter 3: Bid Preparation
3.1 Bidders’ Responses to the Invitation to Tender
3.2 Articles of Agreement or General Terms and Conditions
3.3 Scope of Work
3.4 Has It Been Done Before?
3.5 Changes to the Scope of Work
3.6 Schedule
3.7 Compensation
3.8 Materials
3.9 Specifications and Drawings
3.10 As Built Documentation
3.11 Bid Preparation in General: Alternative Proposals
3.12 Subcontractors
Chapter 4: Evaluation
4.1 Reception and Examination of the Bids
4.2 The Bid Clarification Meeting
4.3 Low Bidding
4.4 Bids Above the Company Estimate
4.5 Unit Rates for Work Variations
4.6 General Observations
Chapter 5: Procedures
5.1 Client’s Procedures
5.2 Project Coordination Procedures (A Typical Client Issue)
5.3 Contractor’s Procedures: The Work Procedure
Chapter 6: Contracts Management
6.1 The Contract Manager
6.2 The Contract Engineer
6.3 The Client’s Team
6.4 Distribution of the Contract
6.5 Execution
6.6 Mobilization
6.7 The Kick-off Meeting
6.8 Indemnity and Insurance
6.9 Liquidated Damages
6.10 Progress Reporting
6.11 Contractor Scheduling Requirements
6.12 The Change Order
6.13 The Negative Change Order
6.14 The Change Order Closeout Form
6.15 The Work Order
6.16 The Amendment
6.17 The Short Form Contract
6.18 Completion and Acceptance
6.19 Mechanical Completion
6.20 Substantial Completion
6.21 Standardization
6.22 Contract Management Policy
6.23 The Contract
6.24 Contract Documents
6.25 Conclusion on Model Contracts and Procedure Standardization
6.26 Conflict of Interest
6.27 The Diplomatic Brush-off
Chapter 7: Claims
7.1 Construction Claims
7.2 A Claim by Any Other Name
7.3 The Breeding Ground–Source of Claims before Contract Award
7.4 After Contract Award
7.5 Types of Construction Claims
7.6 Claim Review
7.7 Contractor Tenacity in Claims Promotion
7.8 Change Order and Claims Meetings
7.9 Contractor’s Claims Preparation and Presentation
7.10 Claim Preparation–The Claims Consultant
7.11 Arbitration
7.12 Negotiation Meetings
7.13 Computer-Aided Quantification of Delay and Disruption Costs
Chapter 8: Payments and Contract Closeout
8.1 Invoicing and Verification
8.2 Work Breakdown Structure
8.3 Measurement of Progress
8.4 Retention
8.5 Warranty Period
8.6 Contract Closeout
8.7 Contract Closeout Checklist
8.8 Contract Closeout Report
Chapter 9: Workshop Exercises
9.1 Vagaries in Contract Language–Claim 1 Installation of Pipelines in a Tunnel
9.2 Contract Intent–Claim 2
9.3 Direct and Consequential Costs–Claim 3
9.4 Extra Work Dispute–Claim 4
9.5 The Great Asphalt Robbery–Claim 5
9.6 The Reimbursable Cost Offshore Bonanza–Claim 6
9.7 The “Life of the Contract–Claim 7 Caused by: Disagreement over Hourly Labor Rates
9.8 Unproven Technology–Claim 8 Caused by: Lump Sum Format Without Preengineering
Chapter 10: Manuals and Models
10.1 The Quality Manual
10.2 The Project Proposal
10.3 The Project Record Book
10.4 The Construction Control Plan
10.5 Appendix 1 Model Contract Document
10.6 Appendix 2 Contract Amendments
10.7 Appendix 3 Model Change Order Contract Change Order
10.8 Appendix 4 Model Work Order Contract Work Order
10.9 Appendix 5 Model Short Form Contract
Glossary of Terms
Index
Chapter 1: Client Policy and Practice
1.1 Introduction
1.2 The Fundamental Contract Document
1.3 Invitations to Bid
1.4 Lump Sum Contracting Preferred
1.5 Lump Sum Plus Unit Rates
1.6 Unit Rate Only
1.7 Reimbursable Cost Contracts Where Necessary
1.8 Cost Plus a Percentage Fee
1.9 Start Cost Reimbursable with Later Conversion to Lump Sum
1.10 Provisional Contract Price Agreement
1.11 Target Cost (Shared Overrun or Underrun)
1.12 Partnering
1.13 Prime Contracts
1.14 Professional Services Contracts
1.15 Short Form Contracts
1.16 Incentive Plans
1.17 Policy on Claims
1.18 Quality and “Intent of Contracts
1.19 Field Administration of Contracts
1.20 Planning Policies
1.21 Integration
1.22 Governmental Policies and Influences–The “Third Party
Chapter 2: The Bid Package
2.1 Preparation by the Client’s Team
2.2 Errors and Omissions
2.3 What Type of Contract?
2.4 Job Explanation Meeting
2.5 Site Visit
2.6 Bid Package Worksheets
Chapter 3: Bid Preparation
3.1 Bidders’ Responses to the Invitation to Tender
3.2 Articles of Agreement or General Terms and Conditions
3.3 Scope of Work
3.4 Has It Been Done Before?
3.5 Changes to the Scope of Work
3.6 Schedule
3.7 Compensation
3.8 Materials
3.9 Specifications and Drawings
3.10 As Built Documentation
3.11 Bid Preparation in General: Alternative Proposals
3.12 Subcontractors
Chapter 4: Evaluation
4.1 Reception and Examination of the Bids
4.2 The Bid Clarification Meeting
4.3 Low Bidding
4.4 Bids Above the Company Estimate
4.5 Unit Rates for Work Variations
4.6 General Observations
Chapter 5: Procedures
5.1 Client’s Procedures
5.2 Project Coordination Procedures (A Typical Client Issue)
5.3 Contractor’s Procedures: The Work Procedure
Chapter 6: Contracts Management
6.1 The Contract Manager
6.2 The Contract Engineer
6.3 The Client’s Team
6.4 Distribution of the Contract
6.5 Execution
6.6 Mobilization
6.7 The Kick-off Meeting
6.8 Indemnity and Insurance
6.9 Liquidated Damages
6.10 Progress Reporting
6.11 Contractor Scheduling Requirements
6.12 The Change Order
6.13 The Negative Change Order
6.14 The Change Order Closeout Form
6.15 The Work Order
6.16 The Amendment
6.17 The Short Form Contract
6.18 Completion and Acceptance
6.19 Mechanical Completion
6.20 Substantial Completion
6.21 Standardization
6.22 Contract Management Policy
6.23 The Contract
6.24 Contract Documents
6.25 Conclusion on Model Contracts and Procedure Standardization
6.26 Conflict of Interest
6.27 The Diplomatic Brush-off
Chapter 7: Claims
7.1 Construction Claims
7.2 A Claim by Any Other Name
7.3 The Breeding Ground–Source of Claims before Contract Award
7.4 After Contract Award
7.5 Types of Construction Claims
7.6 Claim Review
7.7 Contractor Tenacity in Claims Promotion
7.8 Change Order and Claims Meetings
7.9 Contractor’s Claims Preparation and Presentation
7.10 Claim Preparation–The Claims Consultant
7.11 Arbitration
7.12 Negotiation Meetings
7.13 Computer-Aided Quantification of Delay and Disruption Costs
Chapter 8: Payments and Contract Closeout
8.1 Invoicing and Verification
8.2 Work Breakdown Structure
8.3 Measurement of Progress
8.4 Retention
8.5 Warranty Period
8.6 Contract Closeout
8.7 Contract Closeout Checklist
8.8 Contract Closeout Report
Chapter 9: Workshop Exercises
9.1 Vagaries in Contract Language–Claim 1 Installation of Pipelines in a Tunnel
9.2 Contract Intent–Claim 2
9.3 Direct and Consequential Costs–Claim 3
9.4 Extra Work Dispute–Claim 4
9.5 The Great Asphalt Robbery–Claim 5
9.6 The Reimbursable Cost Offshore Bonanza–Claim 6
9.7 The “Life of the Contract–Claim 7 Caused by: Disagreement over Hourly Labor Rates
9.8 Unproven Technology–Claim 8 Caused by: Lump Sum Format Without Preengineering
Chapter 10: Manuals and Models
10.1 The Quality Manual
10.2 The Project Proposal
10.3 The Project Record Book
10.4 The Construction Control Plan
10.5 Appendix 1 Model Contract Document
10.6 Appendix 2 Contract Amendments
10.7 Appendix 3 Model Change Order Contract Change Order
10.8 Appendix 4 Model Work Order Contract Work Order
10.9 Appendix 5 Model Short Form Contract
Glossary of Terms
Index