Construction Delays: Extensions of Time and Prolongation Claims
Autor Roger Gibsonen Limba Engleză Hardback – 30 apr 2008
Written in a practical and user-friendly style, the book includes helpful charts and graphics. It will be useful for construction professionals dealing with extensions of time and delay claims, and for lawyers and others who are involved in the contentious side of the construction and engineering industries.
Roger Gibson has over 40 years of planning & programming experience in the construction and engineering industries. During the latter part of his career his has received many appointments as an Expert in time-related disputes.
Preț: 1287.06 lei
Preț vechi: 1569.58 lei
-18% Nou
Puncte Express: 1931
Preț estimativ în valută:
246.40€ • 257.09$ • 206.54£
246.40€ • 257.09$ • 206.54£
Carte tipărită la comandă
Livrare economică 12-26 martie
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780415345866
ISBN-10: 0415345863
Pagini: 384
Ilustrații: 220 black & white tables, 4 black & white line drawings
Dimensiuni: 156 x 234 x 25 mm
Greutate: 0.87 kg
Ediția:1
Editura: CRC Press
Colecția Routledge
ISBN-10: 0415345863
Pagini: 384
Ilustrații: 220 black & white tables, 4 black & white line drawings
Dimensiuni: 156 x 234 x 25 mm
Greutate: 0.87 kg
Ediția:1
Editura: CRC Press
Colecția Routledge
Public țintă
Professional and Professional Practice & DevelopmentCuprins
Section 1: Introduction 1. The Aims of this Book 2. Extensions of Time 3. Prolongation Claims 4. The SCL Protocol Section 2: Programmes and Record Keeping 5. Background and History of Planning 6. Planning and Programmes 7. The Importance of a Programme 8. Programme Submission, Review and Acceptance 9. Programme Updates and Revisions 10. Progress Records and Other Record Keeping Section 3: Contracts and Case Law 11. Introduction 12. Contracts: JCT and NEC 13. Case Law: Pre 1993 14. Case Law: 1993 to 1999 15. Case Law: 2000 to 2003 16. Case Law: 2004 to 2005 Section 4: The ‘Thorny Issues’ 17. Introduction 18. Float; Ownership and Utilization 19. Concurrency 20. Mitigation and Acceleration 21. Time at Large Section 5: Extensions of Time 22. Introduction 23. EOT Assessment Techniques 24. Prospective Analysis: Methodology and Working Example 25. Retrospective Analysis: Methodology and Working Example Section 6: Prolongation Claims (and Time-Related Costs) 26. Introduction 27. Contract Requirements 28. Prolongation Claims 29. Worked Example Appendices. Appendix 1: Definitions and Glossary. Appendix 2: Levels of Programmes. Appendix 3: Model Specification for a ‘Windows Analysis’. Appendix 4: Charts for Worked Example – Time Impact Analysis. Appendix 5: Charts for Worked Example – Windows Analysis
Recenzii
"This is an easy to read, concise and very useful book on both extensions of time and prolongation claims. The author successfully blends together the case law, his experience, the protocol and some practical advice against the backdrop of the two quite different standard UK construction contracts of NEC and JCT."
-Institution of Civil Engineers
-Institution of Civil Engineers
Descriere
This practical, user-friendly guide for construction professionals and lawyers deals with extensions of time, and includes examples for detailed submissions, helpful charts, graphics and electronic templates.