Cantitate/Preț
Produs

Critical Path Analysis in Practice: Collected papers on project control

Editat de Gail Thornley
en Limba Engleză Hardback – 27 sep 2001
Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.
Citește tot Restrânge

Preț: 104052 lei

Preț vechi: 161972 lei
-36% Nou

Puncte Express: 1561

Preț estimativ în valută:
19910 21695$ 16777£

Carte tipărită la comandă

Livrare economică 23 aprilie-07 mai

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9780415264723
ISBN-10: 0415264723
Pagini: 166
Dimensiuni: 138 x 216 x 18 mm
Greutate: 0.34 kg
Ediția:1
Editura: Taylor & Francis
Colecția Routledge
Locul publicării:Oxford, United Kingdom

Cuprins

Part I Review of Basic CPA Methods; 1. The Scope of the Method, D. WILLIAMS; 2. Introduction to the Basic Method, D. WILLIAMS; 3. The Method of Potentials, J. A. CARRUTHERS; Part II Early Problems of Implementation; 4. Introducing CPA into an Organization, R. COKER; 5. Optimum Level of Detail, H. WALTON; 6. The Use and Abuse of Computers, D. WILLIAMS; Part III Further Aspects of the Technique; 7. ::; 8. Probabilistic Times, J. A. CARRUTHERS; 9. Probabilistic Networks, C. STAFFURTH; ch0010 Network-based Cost Control, P. M. USHER, D. W. FORSYTH; Part IV Large Networks; 11. Major Problem Areas, E. L. BUESNEL; 12. Network Preparation, H. WALTON; 13. Monitoring, D. J. ARMSTRONG; 14. Communication, E. G. TRIMBLE; 15. Organization, R. C. J. TAYLOR; 16. Education and Training, E. L. BUESNEL; Part V Alternative Approaches to Network Problems; 17. Linear Programming and CPA, S. VAJDA; 18. A Note on the Transportation Formulation of CPA, J. A. CARRUTHERS;

Descriere

Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.