Yucca Mountain: Waste Package Closure Control System Crtd Autor Asme et al. 31 dec 2003 Paperback Preț: 440.98 lei 544.41 lei 6-8 săpt. -19%
A Practical Guide to Avoiding Steam Purity Problems in the Industrial Plant Crtd, nr. 35 Editat de Feedwater Quality Task Group 30 noi 1995 Paperback Preț: 70.89 lei 6-8 săpt.
History of Line Pipe Manufacturing in North America Crtd, nr. 43 Autor J. F. Kiefner et al. 31 dec 1995 Paperback Preț: 400.88 lei 6-8 săpt.
Consensus for the Lay-Up of Boilers: Turbines, Turbine Condensers, and Auxiliary Equipment CRTD, nr. 66 Editat de Turbine/Turbine Condenser Lay-Up Task Gr et al. 31 dec 2001 Paperback Preț: 104.92 lei 6-8 săpt.
Consensus on Operating Practices for the Sampling and Monitoring of Feedwater and Boiler Water Chemistry in Modern Industrial Boilers: An ASME Researc Crtd, nr. 81 Editat de ASME Press 31 dec 2005 Paperback Preț: 138.97 lei 6-8 săpt.
Development of Reliability-Based Load and Resistance Factor Design (LRFD) Methods for Piping Crtd, nr. 86 Editat de ASME Press 31 dec 2006 Paperback Preț: 433.73 lei 498.55 lei Indisponibil temporar -13%