Petroleum Production Engineering
Autor Boyun Guo, Xinghui Liu, Xuehao Tanen Limba Engleză Hardback – 16 mar 2017
Completely updated with five sections covering the entire production spectrum, including well productivity, equipment and facilities, well stimulation and workover, artificial lift methods, and flow assurance, this updated edition continues to deliver the most practical applied production techniques, answers, and methods for today’s production engineer and manager.
In addition, updated Excel spreadsheets that cover the most critical production equations from the book are included for download.
- Updated to cover today’s critical production challenges, such as flow assurance, horizontal and multi-lateral wells, and workovers
- Guides users from theory to practical application with the help of over 50 online Excel spreadsheets that contain basic production equations, such as gas lift potential, multilateral gas well deliverability, and production forecasting
- Delivers an all-inclusive product with real-world answers for training or quick look up solutions for the entire petroleum production spectrum
Preț: 743.49 lei
Preț vechi: 965.86 lei
-23% Nou
Puncte Express: 1115
Preț estimativ în valută:
142.29€ • 150.11$ • 118.58£
142.29€ • 150.11$ • 118.58£
Carte tipărită la comandă
Livrare economică 26 decembrie 24 - 09 ianuarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780128093740
ISBN-10: 0128093749
Pagini: 780
Ilustrații: 400 illustrations
Dimensiuni: 191 x 235 x 43 mm
Greutate: 1.54 kg
Ediția:2
Editura: ELSEVIER SCIENCE
ISBN-10: 0128093749
Pagini: 780
Ilustrații: 400 illustrations
Dimensiuni: 191 x 235 x 43 mm
Greutate: 1.54 kg
Ediția:2
Editura: ELSEVIER SCIENCE
Cuprins
Part I: Well Productivity1. Well Components2. Properties of Petroleum Fluids3. Reservoir Deliverability4. Wellbore Flow Performance5. Choke Performance6. Well Deliverability7. Forecast of Well Production8. Production Decline Analysis
Part II: Surface and Downhole Equipment9. Well Tubing and Packers10. Separation Systems11. Transportation Systems
Part III: Well Stimulation and Workover12. Well Problem Identification13. Acidizing14. Hydraulic Fracturing15. Well Workover
Part IV: Artificial Lift Methods16. Sucker Rod Pumping17. Gas Lift18. Other Artificial Lift Methods
Part V: Pipeline Flow Assurance19. Pipeline Precommissioning and Testing20. Gas Hydrate Control21. Other Flow Assurance Issues22. Pipeline Pigging
Part II: Surface and Downhole Equipment9. Well Tubing and Packers10. Separation Systems11. Transportation Systems
Part III: Well Stimulation and Workover12. Well Problem Identification13. Acidizing14. Hydraulic Fracturing15. Well Workover
Part IV: Artificial Lift Methods16. Sucker Rod Pumping17. Gas Lift18. Other Artificial Lift Methods
Part V: Pipeline Flow Assurance19. Pipeline Precommissioning and Testing20. Gas Hydrate Control21. Other Flow Assurance Issues22. Pipeline Pigging