Putting the Just-In-Time Philosophy into Practice: A Strategy for Production Managers
Editat de P.J. O'Gradyen Limba Engleză Paperback – 9 apr 2012
Preț: 379.48 lei
Nou
Puncte Express: 569
Preț estimativ în valută:
72.61€ • 76.02$ • 60.08£
72.61€ • 76.02$ • 60.08£
Carte tipărită la comandă
Livrare economică 07-21 aprilie
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9789401178129
ISBN-10: 9401178127
Pagini: 144
Ilustrații: IX, 129 p.
Dimensiuni: 155 x 235 x 8 mm
Greutate: 0.21 kg
Ediția:Softcover reprint of the original 1st ed. 1988
Editura: SPRINGER NETHERLANDS
Colecția Springer
Locul publicării:Dordrecht, Netherlands
ISBN-10: 9401178127
Pagini: 144
Ilustrații: IX, 129 p.
Dimensiuni: 155 x 235 x 8 mm
Greutate: 0.21 kg
Ediția:Softcover reprint of the original 1st ed. 1988
Editura: SPRINGER NETHERLANDS
Colecția Springer
Locul publicării:Dordrecht, Netherlands
Public țintă
ResearchCuprins
1 Introduction.- Problems of manufacturing management.- Just-in-time.- Implementation: the five steps.- 2 Traditional Manufacturing Management.- Inventory control policies.- Materials requirements planning systems.- Manufacturing resource planning: MRP II.- MRP problems.- 3 Just-In-Time Overview.- JIT is not a software package.- JIT is not a methodology.- Attack fundamental problems.- Eliminate waste.- Strive for simplicity.- Devise systems to identify problems.- Cost/benefit of implementing JIT.- Conclusion and summary.- 4 Step 1 : Getting the Ball Rolling.- Basic understanding.- Preliminary education.- Cost/benefit analysis.- Commitment.- Go/no go decision.- JIT project team selection.- Identifying the pilot plant.- Conclusion.- 5 Step 2: Education — The Make or Break Issue.- What is JIT education?.- Who needs JIT education?.- What should be covered?.- Conclusion.- 6 Step 3: Process Improvements.- Set-up time reduction.- How is low set-up time achieved?.- Preventative maintenance.- Changing to flow lines.- Conclusion.- 7 Step 4: Control Improvements.- Simple control.- Pull systems.- Kanban systems.- Linking MRP with pull/Kanban systems.- Shop floor control and quality at source.- Conclusion.- 8 Step 5: Vendor/Customer Links.- Links with vendors.- Multi-sourcing versus single-sourcing.- Short- versus long-term agreements.- Local versus distant suppliers.- How to implement links with vendors.- Links with customers.- Conclusion.- 9 JIT Implementation — The Proven Path.- How long should the implementation take?.- The implementation sequence — the proven path.- Case study A.- Case study B.- Conclusion.- 10 Summary and Conclusion.- Just-in-time systems.- Potential pitfalls.- The future.- Bibliography and Futher Reading.