Cantitate/Preț
Produs

TPM Reloaded: Total Productive Maintenance

Autor Joel Levitt
en Limba Engleză Hardback – 31 dec 2009
TPM Reloaded: Total Productive Maintenance This is a challenging, innovative, and timely new look at implementing Total Productive Maintenance (TPM) by one of the field's leading trainers and authors. The book takes into account the economic upheavals of recent years and demonstrates that TPM is less about moving maintenance tasks to operations than moving accountability for aggregate output of the plant to operators. The author goes on to show that effective TPM - TPM reloaded -- requires a radical difference in management's view of the worker and even tougher, a radical change in the way workers view their own role.
Citește tot Restrânge

Preț: 34768 lei

Nou

Puncte Express: 522

Preț estimativ în valută:
6654 6912$ 5527£

Carte disponibilă

Livrare economică 11-25 ianuarie 25

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9780831134266
ISBN-10: 0831134267
Pagini: 222
Ilustrații: Illustrations
Dimensiuni: 155 x 234 x 15 mm
Greutate: 0.43 kg
Editura: INDUSTRIAL PR INC

Cuprins

Introduction: TPM in 2010. Introduction to TPM - Who is TPM for? What Does TPM Do? Why Today? Operator is the key. Pillars of TPM. History of TPM. Why Did TPM Come from Auto Assembly? Some important questions about where the idea for TPM came from. Life Under TPM - A Day in the Life of a TPM Shop. TPM Has Two Aspects. Promises Made. Selling TPM. Total plant involvement. TPM Basics - TPM: The Basic Idea. The intention of TPM is engagement. TPM is a TEAM Based Activity. TPM and lean manufacturing and maintenance. JIT (Just in Time). Five Elements of TPM. Maintenance - Maintenance. The Basic Activity of TPM is PM. OEE (Overall Equipment Effectiveness) - Measuring Equipment Effectiveness is an Essential Part of TPM. Different OEE models. OEE is Confusing. Example of OEE. TPM Activities - Return to new conditions. Mini-manual for Operators. Tasks (Getting Down to the Nitty-Gritty). TPM team meetings. Typical team activity is conducting a 1-point lesson. RCA for operators. Lean Maintenance. Facts of Life - What Are We Trying to Do? One Problem However - Past Sins. Ground rules of equipment: What are the Life Cycle Phases of Equipment? CMMS - MRP II interface. The CMMS Work Order. Visual Work Place - Benefits. Examples. When is too much too much. TPM Installation - Seven Steps to Reach Full Autonomous Maintenance. Why Do One Out of Two TPM Installations Fail? Successful TPM Installations. Key Concepts for the TPM Installation. Look Out; Problems Ahead! Steps in Introduction of TPM in an Organization. Training - For TPM to Work, You Better Be Great at Training. Effective Training. Certified Operator, Mechanic Training. Structures to Keep TPM Going - Structure for Remembering To Do Tasks. TPM reporting. Keeping TPM on track. Is TPM for you? - How to decide TPM is for you. TPM Feasibility Study.