Trenchless Technology: Planning, Equipment, and Methods
Autor Mohammad Najafien Limba Engleză Hardback – 16 feb 2013
Publisher's Note: Products purchased from Third Party sellers are not guaranteed by the publisher for quality, authenticity, or access to any online entitlements included with the product.
The complete guide to trenchless technology project management, planning, costs, and methods
Written by an expert in the field of pipeline system engineering, this book describes how to plan, schedule, and implement efficient, cost-effective trenchless technology piping projects. Filled with detailed illustrations and real-world examples, Trenchless Technology: Planning, Equipment, and Methods explains how to accurately compare the costs of trenchless projects,considering geotechnical and rock mass impacts, drilling fluids, and locating and tracking equipment.This in-depth reference provides important information on how to estimate the cost of labor and equipment and schedule trenchless piping projects. A wide range of trenchless technology methods suitable for various groundand project conditions are discussed in this practical resource.
Coverage includes:
- Cost comparison of trenchless technology methods
- Planning for trenchless technology projects
- Project delivery methods
- Geotechnical considerations
- Rock mass properties impacts on trenchless project feasibility
- Tracking, locating, and planning tools for horizontaldirectional drilling
- Drilling and lubricating fluids
- Planning and construction requirements for horizontaldirection drilling
- Horizontal auger boring
- Pipe ramming
- Microtunneling methods
- Pilot tube (or pilot tube microtunneling) method
- Pipe/box jacking and utility tunneling
- Cured-in-place-pipe method
- Sliplining
- Lateral renewal
- Localized repair
- Planning and construction requirements for pipe bursting
- Panel linings
- Spray-in-place pipe
Preț: 910.42 lei
Preț vechi: 1110.27 lei
-18% Nou
Puncte Express: 1366
Preț estimativ în valută:
174.25€ • 181.13$ • 144.34£
174.25€ • 181.13$ • 144.34£
Carte tipărită la comandă
Livrare economică 05-19 februarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780071762458
ISBN-10: 0071762450
Pagini: 608
Dimensiuni: 152 x 231 x 36 mm
Greutate: 0.92 kg
Ediția:New.
Editura: McGraw Hill Education
Colecția McGraw-Hill
Locul publicării:United States
ISBN-10: 0071762450
Pagini: 608
Dimensiuni: 152 x 231 x 36 mm
Greutate: 0.92 kg
Ediția:New.
Editura: McGraw Hill Education
Colecția McGraw-Hill
Locul publicării:United States
Cuprins
Introduction to Trenchless Technology and Cost Estimating and Scheduling
Life Cycle Cost Analysis
Effects of Different Project Delivery Methods on Costs and Schedule
Different Types of Cost Estimating and Scheduling
Budget Estimating
Quantity Takeoff
Preconstruction Services
Pricing Self-performed and subcontractor Work
Cost Estimating and Scheduling for New Pipe Installations
Conventional Pipe Jacking and Utility Tunneling
Horizontal Auger Boring
Microtunneling
Pipe Ramming
Horizontal Directional Drilling
Pilot Tube Microtunneling
Cost Estimating and Scheduling for Existing Pipe Renewals
CIPP
Sliplining
Close-fit Pipe
Modified Sliplining
Thermoformed Pipe
Cost Estimating and Scheduling for Pipe Replacement Methods
Cost Estimating and Scheduling for Manhole Renewals
Project Closeout and Delivery Requirements
Effects of Different Project Delivery Methods on Costs and Schedule
Different Types of Cost Estimating and Scheduling
Budget Estimating
Quantity Takeoff
Preconstruction Services
Pricing Self-performed and subcontractor Work
Cost Estimating and Scheduling for New Pipe Installations
Conventional Pipe Jacking and Utility Tunneling
Horizontal Auger Boring
Microtunneling
Pipe Ramming
Horizontal Directional Drilling
Pilot Tube Microtunneling
Cost Estimating and Scheduling for Existing Pipe Renewals
CIPP
Sliplining
Close-fit Pipe
Modified Sliplining
Thermoformed Pipe
Cost Estimating and Scheduling for Pipe Replacement Methods
Cost Estimating and Scheduling for Manhole Renewals
Project Closeout and Delivery Requirements