Tunnelling ’94: Papers presented at the seventh international symposium, ‘Tunnelling’94’
Autor Vidar Aarvold, I. L. J. Chudleigh, N. S. Webb, G. A. Featherstone, Manfred Bandmann, H. Ramisch, Uwe Beckmann, B. J. Cole, H. J. Lees, Walter Dietz, D. F. Fawcett, P. J. Chapman, D. A. Barratt, M. P. O’Reilly, John Temporal, Jon Baston-Pitt, F. J. Fredriksen, Roald Aabøe, G. J. Hasle, D. A. Hobson, D. C. Gilchrist, Sandor Jancsecz, Walter Steiner, J. P. Farrow, P. M. Claye, R. B. Warren, M. A. Ginary, R. Matthews, H. Kruizenga, C. R. Weeks, T. R. Winterton, Y. Leblais, L. Leblond, Yannis Malios, J. Y. Peron, P. Marcheselli, P. Catling, J. Scholey, A. D. Murray, Bruno Marrai, P. G. Davies, Guilherme Tibau, Erik Gutenwik, Maurício Santana, Pierre Jean Pellegri, R. J. Fowell, G. Richardson, M. J. Gollick, J. G. Beatty, R. J. Ganey, J. E. Killingsworth, L. J. Arthur, A. W. Darby, B. Rafoneke, Graham Daws, Dan MacDonald, Nicola Innaurato, Renato Mancini, Enrico Rondena, Attilio Zaninetti, A. W. P. Coutts, H. R. Davies, R. S. Curtis, A. P. Finch, R. P. Lovat, A. P. Deane, K. T. Burgess, M. C. Knights, M. A. Oswell, I. W. Farmer, B. W. L. Mak, Daniel Morfeldt, C. J. H. Martin, G. Pakes, Sigurdur Finnsson, H. A. Janzon, Claughton, Y. Abd Al-Jalil, R. Remington, H. P. Caspe, A. Y. Kim, L. J. Bergen, J. R. Araujo, Klaus Axhausen, J. E. Hellings, R. J. Mair, Di Harris, J. P. Love, D. Blakey, B. M. New, K. H. Bowers, P. P. Nelson, Richard Harpf, C. Kettleen Limba Engleză Paperback – 21 ian 2013
Preț: 407.95 lei
Nou
Puncte Express: 612
Preț estimativ în valută:
78.08€ • 81.38$ • 64.100£
78.08€ • 81.38$ • 64.100£
Carte tipărită la comandă
Livrare economică 06-20 ianuarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9781461361367
ISBN-10: 1461361362
Pagini: 848
Ilustrații: XXI, 823 p.
Dimensiuni: 155 x 235 x 45 mm
Greutate: 1.17 kg
Ediția:Softcover reprint of the original 1st ed. 1994
Editura: Springer Us
Colecția Springer
Locul publicării:New York, NY, United States
ISBN-10: 1461361362
Pagini: 848
Ilustrații: XXI, 823 p.
Dimensiuni: 155 x 235 x 45 mm
Greutate: 1.17 kg
Ediția:Softcover reprint of the original 1st ed. 1994
Editura: Springer Us
Colecția Springer
Locul publicării:New York, NY, United States
Public țintă
ResearchCuprins
Hydropower.- Lesotho Highlands Water Project: design and layout of underground works for ’Muela Hydropower Project.- Design and construction of the cooling water intake tunnel system for Point Aconi generating station, Nova Scotia.- Comparison of two classification systems as applied to the Alpe Devero tunnel, Italy.- Metro/Rail.- Planning and design of tunnels for the Jubilee Line extension, London.- New St Clair River tunnel, Canada-USA.- Application of NATM to design of underground stations in London Clay.- Water/Waste.- Underground works on Third Nairobi Water Supply Project.- Design and construction of caverns for an underground sewage treatment plant, Hong Kong.- The Snake: a rock tunnel for storing combined sewage water, Stockholm.- Tunnelling on the Penzance and St. Ives sewerage scheme, Cornwall, England.- Tunnel-boring Machines.- Two tunnel-boring machines for Lesotho: a design and case history.- Open TBM tunnelling in complex geology for railroad in Sweden.- Use of sedimentary rock impact indices in evaluation of tunnel-boring machine performance.- Development and performance of tunnel-boring machines on Phase II of the London Water Ring Main.- Environmental Issues.- Environmental planning for the Massachusetts Water Resources Authority’s MetroWest water supply tunnel.- Palais Bernheimer in Munich: tunnelling for parking space under a historic building.- Limiting the damage to historic buildings due to tunnelling: experience at the Mansion House, London.- Compensation grouting to limit settlements during tunnelling at Waterloo Station, London.- Ground movement model validation at the Heathrow Express trial tunnel.- Case Histories.- Gjøvik Olympic Mountain Hall, Norway.- Construction of new escalator shaft and passageways at London Underground’sWaterloo Station.- Water in TBM drives, Delivery Tunnel South, Lesotho Highlands Water Project.- Tunnel-boring Machines.- CEN safety standards for tunnelling machines and air locks.- Tunnels below waste disposal tips.- Machine tunnelling in the northwest of England.- EPB-shield tunnelling for the Taipei Metro, contract 201A.- TBM drive management by use of computerized systems.- Research.- Long-term measurements of loads on tunnel linings in overconsolidated clay.- Non-destructive investigation of tunnels.- Case Histories.- Design, construction and performance of a 700-m ‘cover and cut’ tunnel in soft clay, Norway.- Shotcrete in the construction of Pen-Y-Clip tunnel, North Wales.- Face support for a large Mix-Shield in heterogeneous ground conditions.- Design.- Tunnel ring design, development, testing and manufacture for the London Water Ring Main.- Medway tunnel detailed design.- Developments in precast concrete tunnel linings in the United Kingdom.- Case Histories.- Channel tunnel: French undersea crossover design and construction.- Design and construction of Metsovon road tunnel, Greece.- Construction of the ‘Passante Ferroviario’ link in Milan, Italy, lots 3P, 5P and 6P: excavation by large earth pressure balanced shield with chemical foam injection.- Pen-Y-Clip road tunnel, North Wales: achieving a dry lining through a pervious rock formation.- Hydropower.- Tunnel design in the design and construct context—the Pergau experience, Malaysia.- Serra da Mesa project, Brazil: excavation of shafts and penstocks.- Tunnel Machinery.- Rock cutting with roadheaders.- Increased productivity in construction of civil and mining tunnels through the use of high-capacity tunnel-boring machines and continuous belt conveyor muck haulage.