Cantitate/Preț
Produs

Turnaround, Shutdown and Outage Management: Effective Planning and Step-by-Step Execution of Planned Maintenance Operations

Autor Tom Lenahan
en Limba Engleză Hardback – 28 noi 2005
Shutdown management is project management of a special kind: managing the repair, replacement or maintenance of critical systems. Manufacturing and process plants, computer systems, airliners, and many other systems must be regularly closed down or taken out of service for planned maintenance operations. This book provides a complete shutdown project planning guide along with a new, detailed model of excellence and step-by-step project guide. In a critical field, this book shows the maintenance manager or project leader how to get the job done correctly.

*Covers all aspects of major maintenance project planning, minimizing downtime and improving maintenance schedules
*Covers projects ranging from weekend overhauls through to complete plant rebuilds
*With detailed checklists and a new step-by-step project guide
Citește tot Restrânge

Preț: 34972 lei

Preț vechi: 41144 lei
-15% Nou

Puncte Express: 525

Preț estimativ în valută:
6694 7019$ 5531£

Carte disponibilă

Livrare economică 08-22 ianuarie 25
Livrare express 25-31 decembrie pentru 3562 lei

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9780750667876
ISBN-10: 0750667877
Pagini: 256
Ilustrații: Illustrated
Dimensiuni: 156 x 234 x 20 mm
Greutate: 0.57 kg
Ediția:2 Rev ed.
Editura: ELSEVIER SCIENCE

Public țintă

Maintenance engineers, plant engineers, engineering managers. Key sectors include process and manufacturing sectors (petrochemical and food processing especially); aircraft maintenance; power generation and other utilities; large-scale assembly plants. Performance management specialists, Six Sigma readership, continuous improvement specialists, TPM.

Cuprins

Part 1: Turnaround overview: context and strategy; Initiating the turnaround; Validating the work scope; Pre-shutdown work; Contractor packages; The turnaround plan; The turnaround organization; Site logistics; The cost profile; The safety plan; The quality plan; The communications package; Executing the turnaround; Terminating the turnaround. Part 2: Real World Application; Case Study 1 - Designing an organisation; Case Study 2 - Worklist control; Case Study 3 - Contract strategy; Case Study 5 - Logistics; Case Study 4 - Cost Control; Summing up - A reality check