Construction Scheduling, Cost Optimization and Management
Autor Hojjat Adeli, Asim Karimen Limba Engleză Hardback – 25 ian 2001
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 501.39 lei 6-8 săpt. | |
CRC Press – 12 dec 2019 | 501.39 lei 6-8 săpt. | |
Hardback (1) | 1444.61 lei 6-8 săpt. | |
CRC Press – 25 ian 2001 | 1444.61 lei 6-8 săpt. |
Preț: 1444.61 lei
Preț vechi: 1761.72 lei
-18% Nou
Puncte Express: 2167
Preț estimativ în valută:
276.46€ • 287.56$ • 228.23£
276.46€ • 287.56$ • 228.23£
Carte tipărită la comandă
Livrare economică 14-28 aprilie
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780415244176
ISBN-10: 041524417X
Pagini: 338
Dimensiuni: 156 x 234 x 21 mm
Greutate: 0.7 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
ISBN-10: 041524417X
Pagini: 338
Dimensiuni: 156 x 234 x 21 mm
Greutate: 0.7 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
Public țintă
Postgraduate and ProfessionalCuprins
1. Review of Construction Scheduling and Management Methods. 2. Neural Dynamics Model of Adeli and Park and its Application to Engineering Design. 3. A General Mathematical Formulation for Scheduling of Construction Projects with Construction Cost Optimization. 4. Solution of Construction Scheduling and Cost Optimization with Neural Dynamics. 5. An Object-Oriented Information Model for Construction Project Management. 6. CONSCOM: An Object-Orient Construction Scheduling and Change Management System. 7. Integrated Management Environment and User Interface. 8. Regularization Neural Network for Construction Cost Estimation. References. Appendix Nomenclature.
Notă biografică
Hojjat Adeli is Professor of Civil and Environmental Engineering and Geodtic Science and Director of Knowledge Engineering Lab at The Ohio State University. He is a leading, world-renowned researcher and inventor and author of 340 research publications including nine highly acclaimed and pioneering books in the general field of computer-aided engineering (CAE). His ground-breaking research has appeared in 54 different scholarly journals covering many disciplines and had a profound impact on the direction of CAE research. He is the Editor-in-Chief of two prestigious journals Computer-Aided Civil and Infrastructure Engineering and Integrated Computer-Aided Engineering. He is the recipient of numerous awards and honours. In 1998, he was awarded the University Distinguished Scholar Award by The Ohio State University.
Recenzii
'Here is a practical guide for those involved in the construction industry, including engineers, contractors, and project managers.'- Business Review May-June 2002
Descriere
This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.