Cantitate/Preț
Produs

Final Safety Evaluation Report

Autor U. S. Nuclear Regulatory Commission
en Limba Engleză Paperback
The U.S. Nuclear Regulatory Commission (NRC) regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 52 include requirements for licensing new nuclear power plants.3 These regulations include the NRC's requirements for early site permit (ESP), design certification, and combined license (COL) applications. The ESP process (10 CFR Part 52, Subpart A, "Early Site Permits") is intended to address and resolve siting-related issues. The design certification process (10 CFR Part 52, Subpart B, "Standard Design Certifications") provides a means for a vendor to obtain NRC certification of a particular reactor design. Finally, the COL process (10 CFR Part 52, Subpart C, "Combined Licenses") allows an applicant to seek authorization to construct and operate a new nuclear power plant. A COL may reference an ESP, a certified design, both, or neither. As part of demonstrating that all applicable NRC requirements are met, a COL applicant referencing an ESP or certified design must demonstrate compliance with any requirements not already resolved as part of the referenced ESP or design certification before the NRC issues that COL.
Citește tot Restrânge

Toate formatele și edițiile

Toate formatele și edițiile Preț Express
Paperback (3) 17359 lei  3-5 săpt.
  CREATESPACE – 17359 lei  3-5 săpt.
  CREATESPACE – 19459 lei  3-5 săpt.
  CREATESPACE – 20099 lei  3-5 săpt.

Preț: 17359 lei

Nou

Puncte Express: 260

Preț estimativ în valută:
3324 3461$ 2758£

Carte disponibilă

Livrare economică 23 ianuarie-06 februarie

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9781499623574
ISBN-10: 1499623577
Pagini: 442
Dimensiuni: 216 x 279 x 23 mm
Greutate: 1.02 kg
Editura: CREATESPACE