ICOLD Dam Decommissioning - Guidelines: ICOLD Bulletins Series
Editat de CIGB ICOLDen Limba Engleză Paperback – 17 oct 2018
The ICOLD Committee for decommissioning dams was established in 2005 to develop information that can be used by ICOLD members to respond to questions about the dismantling of dams and to provide a forum for the exchange of information . This ICOLD Bulletin is not intended as a design guide, but as a guide to the decision making process, consultation and regulatory approvals, design and construction issues, sediment management and performance monitoring.
The primary aim of these Dam decommissioning guidelines is to provide dam owners, dam engineers and other professionals with the information needed to guide decision making when considering dam dismantling as a project alternative. They are not meant to be used as a design guide, but as a guide to highlighting the points of interest. The guidelines in this ICOLD Bulletin apply only to flood defense structures and not to fall dams.
Preț: 549.43 lei
Preț vechi: 740.97 lei
-26% Nou
Puncte Express: 824
Preț estimativ în valută:
105.15€ • 110.93$ • 87.63£
105.15€ • 110.93$ • 87.63£
Carte tipărită la comandă
Livrare economică 02-16 ianuarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9781138491205
ISBN-10: 1138491209
Pagini: 144
Dimensiuni: 156 x 234 x 8 mm
Greutate: 0.45 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
Seria ICOLD Bulletins Series
ISBN-10: 1138491209
Pagini: 144
Dimensiuni: 156 x 234 x 8 mm
Greutate: 0.45 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
Seria ICOLD Bulletins Series
Public țintă
Postgraduate and ProfessionalCuprins
1 Foreword
2 Introduction
3 Decommissioning decision making process
4 Consultation and regulatory approvals
5 Design and construction issues
6 Sediment management
7 Performance monitoring
8 Selected case studies
References
2 Introduction
3 Decommissioning decision making process
4 Consultation and regulatory approvals
5 Design and construction issues
6 Sediment management
7 Performance monitoring
8 Selected case studies
References
Descriere
The topic of dam decommissioning or dam removal has come up with increasing frequency in the past decade. The reason for considering dam removal may be dam safety concerns, high repair costs, high operation and maintenance costs, or impacts on fish passage and water quality. This ICOLD Bulletin provides owners of dams, dam technicians and other professionals with the information needed to guide decision making when considering dam dismantling as a project alternative.