Price-Based Commitment Decisions in the Electricity Market: Advances in Industrial Control
Autor Eric Allen, Marija Ilicen Limba Engleză Paperback – 31 oct 2012
Din seria Advances in Industrial Control
- 15% Preț: 630.33 lei
- 23% Preț: 582.63 lei
- 18% Preț: 768.13 lei
- 18% Preț: 928.16 lei
- 20% Preț: 568.24 lei
- 15% Preț: 630.15 lei
- 18% Preț: 880.98 lei
- 18% Preț: 873.29 lei
- 18% Preț: 725.58 lei
- 18% Preț: 941.76 lei
- Preț: 363.80 lei
- 15% Preț: 632.24 lei
- 15% Preț: 625.52 lei
- 18% Preț: 882.85 lei
- 18% Preț: 1382.30 lei
- 18% Preț: 714.17 lei
- 20% Preț: 1003.77 lei
- 18% Preț: 928.16 lei
- 15% Preț: 630.33 lei
- 15% Preț: 641.07 lei
- 18% Preț: 931.26 lei
- 15% Preț: 631.27 lei
- 18% Preț: 1364.82 lei
- 18% Preț: 930.96 lei
- 18% Preț: 930.64 lei
- 18% Preț: 930.17 lei
- 18% Preț: 931.26 lei
- 18% Preț: 1091.14 lei
- 15% Preț: 636.90 lei
- 15% Preț: 631.92 lei
- 18% Preț: 931.09 lei
- 18% Preț: 929.39 lei
- 18% Preț: 1090.05 lei
- 15% Preț: 631.61 lei
- 18% Preț: 933.88 lei
- 18% Preț: 926.46 lei
- 15% Preț: 627.93 lei
- 15% Preț: 630.09 lei
- 20% Preț: 637.75 lei
- 18% Preț: 1090.05 lei
- 20% Preț: 978.13 lei
- 15% Preț: 630.33 lei
- 18% Preț: 929.69 lei
- 18% Preț: 1353.42 lei
- 15% Preț: 638.35 lei
- 15% Preț: 634.00 lei
- 20% Preț: 563.66 lei
- 18% Preț: 977.80 lei
- 18% Preț: 1200.93 lei
Preț: 378.46 lei
Nou
Puncte Express: 568
Preț estimativ în valută:
72.44€ • 75.29$ • 60.00£
72.44€ • 75.29$ • 60.00£
Carte tipărită la comandă
Livrare economică 05-19 februarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9781447111627
ISBN-10: 1447111621
Pagini: 264
Ilustrații: XVIII, 242 p.
Dimensiuni: 155 x 235 x 14 mm
Greutate: 0.37 kg
Ediția:Softcover reprint of the original 1st ed. 1999
Editura: SPRINGER LONDON
Colecția Springer
Seria Advances in Industrial Control
Locul publicării:London, United Kingdom
ISBN-10: 1447111621
Pagini: 264
Ilustrații: XVIII, 242 p.
Dimensiuni: 155 x 235 x 14 mm
Greutate: 0.37 kg
Ediția:Softcover reprint of the original 1st ed. 1999
Editura: SPRINGER LONDON
Colecția Springer
Seria Advances in Industrial Control
Locul publicării:London, United Kingdom
Public țintă
Professional/practitionerCuprins
1 Introduction.- 2 The Unit Commitment Problem.- 2.1 Unit Commitment in a Regulated Industry.- 2.2 Present Unit Commitment Solution Methods.- 2.3 Interruptible Service Contracts.- 3 Unit Commitment in a Deregulated Environment.- 3.1 Possible Formats for the Electricity Market.- 3.2 Unit Commitment for an Individual Supplier.- 3.3 Multiple Generation.- 3.4 Secondary Market for Reliability.- 3.5 Other Issues.- 4 Survey of the Dynamic Programming Formulation.- 4.1 Finite Horizon Problems.- 4.2 Infinite Horizon Problems with a Discount Factor.- 4.3 Stochastic Shortest Path Problems.- 4.4 Average Cost per Stage Problems.- 5 Unit Commitment for an Individual Power Producer.- 5.1 Unit Commitment without Generation Limits.- 5.2 Unit Commitment with Generation Limits.- 6 Price Process of Electricity.- 6.1 Price Process Models.- 6.2 Correlation of Price with Load.- 6.3 Correlation of Load with Date.- 6.4 Correlation of Load with Temperature.- 6.5 Effects of Variance of Load Estimation.- 7 Computational Complexity of Unit Commitment.- 7.1 Dynamic Programming Algorithm.- 7.2 Heuristic Simplifications.- 7.3 Ordinal Optimization.- 7.4 Example.- 8 Forward Contracts and Futures.- 8.1 Forward Contracts.- 8.2 Producer Profits with Forward Contracts.- 8.3 Forward Contract Strategies.- 8.4 Temporal Forward Contract Problem.- 9 Reserve Markets for Power System Reliability.- 9.1 General Form of a Reserve Market.- 9.2 Individual Power Producer Strategies for Selling Reserve.- 9.3 Provision of Reserve for Transactions.- 9.4 Effect of Reserve Market on Unit Commitment.- 9.5 Example.- 10 Unit Commitment in Congested Transmission Systems.- 10.1 Probabilistic Model of Congestion.- 10.2 Producer Strategy under Congestion.- 10.3 Example.- 10.4 Solution of Unit Commitment under Congestion and Reserve.- 11 Conclusions.- A Calculation of Parameters for Price Processes.- A.1 Exponential of a Normally Distributed Variable.- A.2 Nonlinear Least Squares Regression.- A.3 Recursive Least Squares Algorithm.- B Results of Regression of Load vs. Temperature.- B.1 Regression on Same Day High Temperature.- B.2 Regression using Previous Day’s High Temperature.- C Derivation of Formulas for Truncated Random Variables.- C.1 Truncated Normal Distributions.- C.2 Truncated Lognormal Distributions.- D Software for Unit Commitment.- D.1 Dynamic Programming Software.- D.2 Ordinal Optimization Software.- D.3 Reserve and Congestion DP Software.- D.4 Source Code for uci2. c.- D.5 Source Code for ucool. c.- D.6 Source Code for uci2rs. c.- D.7 Source Code for uci2con. c.- D.8 Source Code for ucerr.h.- D.9 Source Code for ucerroo. h.- E Stochastic Unit Commitment in a Regulated Industry.- E.1 Unit Commitment with a Finite Horizon.- E.2 Solution of Optimal Power Flow.- E.2.1 Uncongested, Lossless Optimal Power Flow without Generation Limits.- E.3 Expected Value of the Generation Cost.- E.3.1 Expected Cost over Load Power.- E.3.2 Expected Cost over Generation Failures.
Caracteristici
Offers a re-evaluation of the electric power industry