Project Execution of Mega-Projects for the Oil and Gas Industries
Autor Soosaiya Anthreasen Limba Engleză Hardback – 24 mar 2021
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 309.12 lei 6-8 săpt. | +66.58 lei 7-13 zile |
CRC Press – 25 sep 2023 | 309.12 lei 6-8 săpt. | +66.58 lei 7-13 zile |
Hardback (1) | 483.01 lei 6-8 săpt. | +129.60 lei 7-13 zile |
CRC Press – 24 mar 2021 | 483.01 lei 6-8 săpt. | +129.60 lei 7-13 zile |
Preț: 483.01 lei
Preț vechi: 650.53 lei
-26% Nou
Puncte Express: 725
Preț estimativ în valută:
92.44€ • 97.24$ • 77.13£
92.44€ • 97.24$ • 77.13£
Carte tipărită la comandă
Livrare economică 09-23 ianuarie 25
Livrare express 05-11 decembrie pentru 139.59 lei
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780367675257
ISBN-10: 0367675250
Pagini: 208
Ilustrații: 20 Tables, black and white; 7 Illustrations, black and white
Dimensiuni: 156 x 234 x 19 mm
Greutate: 0.45 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
ISBN-10: 0367675250
Pagini: 208
Ilustrații: 20 Tables, black and white; 7 Illustrations, black and white
Dimensiuni: 156 x 234 x 19 mm
Greutate: 0.45 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
Public țintă
Academic and Professional Practice & DevelopmentCuprins
SECTION I PLANNING AND EXECUTION IN LEVEL 3. 1. Management, Control and Administration. 2. HSE, Social and Security. 3. Services and Facilities to Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning, Start-up and Performance Test. 10. Temporary Facilities. SECTION II COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12. Extension of Time. 13. Professionally Handling Large Claims. 14. Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays. 16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25. Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29. Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract Price below Floor Price and Consequences. 32. Owner’s Delay on Document Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells (Owner Delays). 36. Strategy for using Non-Spec Feedstock for Commissioning. 37. Gas In and Authority Check points. 38. Value Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT (Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2. Contract Price Weight Factor. 3. Monthly Status Report Contents. 4. Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter. 9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of Procedures and Plans. 11. Total Plant Break down into Areas.
Notă biografică
Soosaiya Anthreas graduated from CIT in Mechanical Engineering. He has thirty four years of experience from mega industrial projects in the field of project development, project management and project construction. He worked in global EPC companies like Samsung Engineering and Technip FMC. As a weekend novelist, he published his first literary fiction novel, The Dance of the Sea. He lives in Chennai with wife and son..
Descriere
This book covers execution of mega industrial projects in oil/gas industries covering engineering, procurement, construction, commissioning and performance testing and covers various tasks under each discipline to define the detailed scope of work, supplies and services.