System Verification: Proving the Design Solution Satisfies the Requirements
Autor Jeffrey O. Gradyen Limba Engleză Hardback – 6 iun 2007
Systems engineering usually begins with defining a product that will satisfy a customer need and then rationally building a set of required components, personnel, and financial resources. The testing and evaluating of a proposed design solution is known as Verification, and this will guide the systems engineer and his engineering and management team in setting up the detailed protocols for a step-by-step quality control check of each stage of a proposed system design.
- Complete overview of the basic principles involved in setting up a System Verification program
- Follows a proven pattern of "Define the problem, "Solve the Problem," and "Prove it"
- Covers a variety of approaches to Qualification Verification, System Test and Evaluation, and Acceptance Verification, as well as Process Verification
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 477.32 lei 5-7 săpt. | |
ELSEVIER SCIENCE – 8 mai 2016 | 477.32 lei 5-7 săpt. | |
Hardback (1) | 592.28 lei 6-8 săpt. | |
ELSEVIER SCIENCE – 6 iun 2007 | 592.28 lei 6-8 săpt. |
Preț: 592.28 lei
Preț vechi: 769.20 lei
-23% Nou
Puncte Express: 888
Preț estimativ în valută:
113.36€ • 118.15$ • 94.37£
113.36€ • 118.15$ • 94.37£
Carte tipărită la comandă
Livrare economică 04-18 ianuarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780123740144
ISBN-10: 0123740142
Pagini: 368
Ilustrații: Approx. 100 illustrations
Dimensiuni: 184 x 260 x 27 mm
Greutate: 0.98 kg
Editura: ELSEVIER SCIENCE
ISBN-10: 0123740142
Pagini: 368
Ilustrații: Approx. 100 illustrations
Dimensiuni: 184 x 260 x 27 mm
Greutate: 0.98 kg
Editura: ELSEVIER SCIENCE
Public țintă
Professional Systems Engineers; Industrial Engineers; Manufacturing Engineers; Mechanical Engineers; Project Managers; Product ManagersCuprins
PART I: SETTING THE STAGEIntroduction to System DevelopmentSystem Requirements Analysis OverviewThe Global Verification Situation
PART II: ITEM QUALIFICATION VERIFICATIONVerification RequirementsTop-Down Verification PlanningItem Qualification Test Planning AnalysisItem Qualification Test ImplemenationNon-Test Item Qualification Methods CoordinationItem Qualification Verification ReportingItem Qualification Verification Management and AuditItem Qualification Verification Close-out
PART III: ITEM ACCEPTANCE VERIFICATIONAcceptance Test Planning AnalysisOther Acceptance Methods CoordinationProduct Acceptance Verification ReportingProduct Verification Management and Audit
PART IV: SYSTEM TEST AND EVALUATIONSystem Verification PlanningSystem Test and Evaluation ManagementItem and System Re-Verification
PART V: PROCESS VALIDATION AND VERIFICATIONProcess ValidationProcess Verification
PART VI: POSTSCRIPTVerifciation and Systems Development Closure
PART II: ITEM QUALIFICATION VERIFICATIONVerification RequirementsTop-Down Verification PlanningItem Qualification Test Planning AnalysisItem Qualification Test ImplemenationNon-Test Item Qualification Methods CoordinationItem Qualification Verification ReportingItem Qualification Verification Management and AuditItem Qualification Verification Close-out
PART III: ITEM ACCEPTANCE VERIFICATIONAcceptance Test Planning AnalysisOther Acceptance Methods CoordinationProduct Acceptance Verification ReportingProduct Verification Management and Audit
PART IV: SYSTEM TEST AND EVALUATIONSystem Verification PlanningSystem Test and Evaluation ManagementItem and System Re-Verification
PART V: PROCESS VALIDATION AND VERIFICATIONProcess ValidationProcess Verification
PART VI: POSTSCRIPTVerifciation and Systems Development Closure