Thermal Power Plant: Pre-Operational Activities

Autor Dipak Sarkar
en Limba Engleză Paperback – 21 aug 2016
Thermal Power Plants: Pre-Operational Activities covers practical information that can be used as a handy reference by utility operators and professionals working in new and existing plants, including those that are undergoing refurbishments and those that have been shut for long periods of time. It is fully comprehensive, including chapters on flushing boiler systems, various methods of testing steam generators, and the drying out of generators.
This book will be invaluable for anyone working on the startup, commissioning, and operation of thermal power plants. It is also a great companion book to Sarkar’s Thermal Power Plant: Design and Operation. Sarkar has worked with thermal power plants for over 40 years, bringing his experience in design and operations to help new and experienced practicing engineers perform effective pre-operational activities.


  • Consolidates all pre-operational aspects of thermal power plants
  • Explains how to handle equipment safely and work efficiently
  • Provides guidance for new and existing power plants to help reduce outage time and save on budgets
Citește tot Restrânge

Toate formatele și edițiile

Toate formatele și edițiile Preț Express
Paperback (2) 49151 lei  5-7 săpt.
  ELSEVIER SCIENCE – 21 aug 2016 49151 lei  5-7 săpt.
  ELSEVIER SCIENCE – 26 aug 2015 61087 lei  5-7 săpt.

Preț: 49151 lei

Preț vechi: 54012 lei
-9% Nou

Puncte Express: 737

Preț estimativ în valută:
9406 9808$ 7817£

Carte tipărită la comandă

Livrare economică 14-28 martie

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9780081011126
ISBN-10: 0081011121
Pagini: 474
Dimensiuni: 191 x 235 x 24 mm
Greutate: 0.98 kg
Editura: ELSEVIER SCIENCE

Cuprins

1. General Description of Thermal Power Plant
2. Quality Assurance and Quality Control (Applicable to Pre-Operational Activities)
Part I: Pre-Operational Cleaning Of Various Sub-Systems
3. Alkali Flushing of Pre-Boiler System
4. Flushing of Fuel Oil Piping System
5. Blowing of Fuel Gas Piping System
6. Chemical Cleaning of Steam Generator
7. Flushing of Lube Oil Piping System
8. Steam/Air Blowing of MS, CRH, HRH and Other Steam Pipe Lines
Part II: Activities That Make Critical Equipment Ready To Put Them In Service
9. Hydraulic Test of Steam Generator
10. Air-tightness/Leakage Test of Furnace, Air and Flue Gas Ducts of Steam Generator
11. Steam Generator Initial Firing and Drying-out of Insulation
12. Floating of Steam Generator Safety Valves
13. Clean Air Flow Test of Pulverizers
14. Condenser Flood Test and Vacuum Tightness Test
15. Generator Drying Out and Air-Tightness Test
16. Filling of Generator With Hydrogen and Protection Stability Test of Generator
17. Completion Test of the Power Station
Appendix A: Brief Description on Performance Guarantee/Acceptance Tests
Appendix B: General Safety Guidelines
Appendix C: Tagging Procedure
Appendix D