Thermal Power Plant: Pre-Operational Activities
Autor Dipak Sarkaren Limba Engleză Paperback – 21 aug 2016
This book will be invaluable for anyone working on the startup, commissioning, and operation of thermal power plants. It is also a great companion book to Sarkar’s Thermal Power Plant: Design and Operation. Sarkar has worked with thermal power plants for over 40 years, bringing his experience in design and operations to help new and experienced practicing engineers perform effective pre-operational activities.
- Consolidates all pre-operational aspects of thermal power plants
- Explains how to handle equipment safely and work efficiently
- Provides guidance for new and existing power plants to help reduce outage time and save on budgets
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (2) | 491.51 lei 5-7 săpt. | |
ELSEVIER SCIENCE – 21 aug 2016 | 491.51 lei 5-7 săpt. | |
ELSEVIER SCIENCE – 26 aug 2015 | 610.87 lei 5-7 săpt. |
Preț: 491.51 lei
Preț vechi: 540.12 lei
-9% Nou
Puncte Express: 737
Preț estimativ în valută:
94.06€ • 98.08$ • 78.17£
94.06€ • 98.08$ • 78.17£
Carte tipărită la comandă
Livrare economică 14-28 martie
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780081011126
ISBN-10: 0081011121
Pagini: 474
Dimensiuni: 191 x 235 x 24 mm
Greutate: 0.98 kg
Editura: ELSEVIER SCIENCE
ISBN-10: 0081011121
Pagini: 474
Dimensiuni: 191 x 235 x 24 mm
Greutate: 0.98 kg
Editura: ELSEVIER SCIENCE
Cuprins
1. General Description of Thermal Power Plant
2. Quality Assurance and Quality Control (Applicable to Pre-Operational Activities)
Part I: Pre-Operational Cleaning Of Various Sub-Systems
3. Alkali Flushing of Pre-Boiler System
4. Flushing of Fuel Oil Piping System
5. Blowing of Fuel Gas Piping System
6. Chemical Cleaning of Steam Generator
7. Flushing of Lube Oil Piping System
8. Steam/Air Blowing of MS, CRH, HRH and Other Steam Pipe Lines
Part II: Activities That Make Critical Equipment Ready To Put Them In Service
9. Hydraulic Test of Steam Generator
10. Air-tightness/Leakage Test of Furnace, Air and Flue Gas Ducts of Steam Generator
11. Steam Generator Initial Firing and Drying-out of Insulation
12. Floating of Steam Generator Safety Valves
13. Clean Air Flow Test of Pulverizers
14. Condenser Flood Test and Vacuum Tightness Test
15. Generator Drying Out and Air-Tightness Test
16. Filling of Generator With Hydrogen and Protection Stability Test of Generator
17. Completion Test of the Power Station
Appendix A: Brief Description on Performance Guarantee/Acceptance Tests
Appendix B: General Safety Guidelines
Appendix C: Tagging Procedure
Appendix D
2. Quality Assurance and Quality Control (Applicable to Pre-Operational Activities)
Part I: Pre-Operational Cleaning Of Various Sub-Systems
3. Alkali Flushing of Pre-Boiler System
4. Flushing of Fuel Oil Piping System
5. Blowing of Fuel Gas Piping System
6. Chemical Cleaning of Steam Generator
7. Flushing of Lube Oil Piping System
8. Steam/Air Blowing of MS, CRH, HRH and Other Steam Pipe Lines
Part II: Activities That Make Critical Equipment Ready To Put Them In Service
9. Hydraulic Test of Steam Generator
10. Air-tightness/Leakage Test of Furnace, Air and Flue Gas Ducts of Steam Generator
11. Steam Generator Initial Firing and Drying-out of Insulation
12. Floating of Steam Generator Safety Valves
13. Clean Air Flow Test of Pulverizers
14. Condenser Flood Test and Vacuum Tightness Test
15. Generator Drying Out and Air-Tightness Test
16. Filling of Generator With Hydrogen and Protection Stability Test of Generator
17. Completion Test of the Power Station
Appendix A: Brief Description on Performance Guarantee/Acceptance Tests
Appendix B: General Safety Guidelines
Appendix C: Tagging Procedure
Appendix D