Towards a Software Factory
Autor M. Van Genuchtenen Limba Engleză Hardback – 31 mai 1992
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 627.24 lei 43-57 zile | |
SPRINGER NETHERLANDS – 21 sep 2012 | 627.24 lei 43-57 zile | |
Hardback (1) | 633.86 lei 43-57 zile | |
SPRINGER NETHERLANDS – 31 mai 1992 | 633.86 lei 43-57 zile |
Preț: 633.86 lei
Preț vechi: 792.33 lei
-20% Nou
Puncte Express: 951
Preț estimativ în valută:
121.31€ • 126.01$ • 100.76£
121.31€ • 126.01$ • 100.76£
Carte tipărită la comandă
Livrare economică 03-17 februarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780792317517
ISBN-10: 0792317513
Pagini: 190
Ilustrații: VIII, 177 p.
Dimensiuni: 155 x 235 x 16 mm
Greutate: 0.46 kg
Ediția:1992
Editura: SPRINGER NETHERLANDS
Colecția Springer
Locul publicării:Dordrecht, Netherlands
ISBN-10: 0792317513
Pagini: 190
Ilustrații: VIII, 177 p.
Dimensiuni: 155 x 235 x 16 mm
Greutate: 0.46 kg
Ediția:1992
Editura: SPRINGER NETHERLANDS
Colecția Springer
Locul publicării:Dordrecht, Netherlands
Public țintă
ResearchCuprins
1 Introduction and Definition of the Problem.- 1.1 Introduction.- 1.2 Importance of software engineering.- 1.3 Problems of software engineering.- 1.4 Definition of the problem.- 1.5 The Process - Control - Information model.- 1.6 Contents.- 2 Why is Software Late ?.- Empirical studies of reasons for delay in software development.- 2.1 Introduction.- 2.2 Surveys on the overrun of development projects.- 2.3 Definition and planning of the study.- 2.4 A systems software department.- 2.5 A diversified software development department.- 2.6 A CAD development project.- 2.7 Summary and conclusions.- 3 Changes in Software Engineering Control.- 3.1 Introduction.- 3.2 Basic principles of traditional software development.- 3.3 Traditional control.- 3.4 Changes in software engineering and its control.- 3.5 Summary and conclusions.- 4 Quality and Maintenance; towards product control.- 4.1 Introduction.- 4.2 Quality attributes.- 4.3 Quality definitions.- 4.4 Causes of increasing maintenance.- 4.5 A response to the maintenance problem.- 4.6 Consequences for control.- 4.7 Summary and conclusions.- 5 Reuse of Software; towards multiproduct control.- 5.1 Introduction.- 5.2 The necessity of reuse.- 5.3 Reuse in industry.- 5.4 A parallel in software development.- 5.5 Reuse of software.- 5.6 Multiproduct control.- 5.7 A specific software factory.- 6 Towards a Software Factory.- 6.1 Introduction.- 6.2 Levels of process control.- 6.3 Steps towards the software factory.- 6.4 Summary and conclusions.- 7 Information Systems in Software Engineering Control and Production Control.- 7.1 Introduction.- 7.2 Information systems for software engineering control.- 7.3 Comparison of the systems and assessment with respect to the software factory.- 7.4 Information systems in production control.- 7.5 Assessment with respect to the software factory.- 7.6 Summary and conclusions.- 8 A Data Model for an Information System for Multiproduct Control.- 8.1 Introduction.- 8.2 Additional requirements.- 8.3 A data model.- 8.4 A description of some entities.- 8.5 Use of the proposed data model.- 9 First Steps Towards a Software Factory.- 9.1 Introduction.- 9.2 Basic principles.- 9.3 Two examples of data collection with regard to time and money.- 9.4 Two examples of data collection with regard to quality.- 10 Conclusions and Recommendations.- 10.1 Introduction.- 10.2 Summary and conclusions.- 10.3 Recommendations for future research.- References.