The 'RICS New rules of measurement: Order of cost estimating and cost planning of capital building works' (referred to as NRM1) is the cornerstone of good cost management of capital building works projects - enabling more effective and accurate cost advice to be given to clients and other project team members, while facilitating better cost control.
The NRM1 Cost Management Handbook is the essential guide to how to successfully interpret and apply these rules, including explanations of how to:
- quantify building works and prepare order of cost estimates and cost plans
- use the rules as a toolkit for risk management and procurement
- analyse actual costs for the purpose of collecting benchmark data and preparing cost analyses
- capture historical cost data for future order of cost estimates and elemental cost plans
- employ the rules to aid communication
- manage the complete 'cost management cycle'
- use the elemental breakdown and cost structures, together with the coding system developed for NRM1, to effectively integrate cost management with Building Information Modelling (BIM).
Preț: 425.29 lei
Preț vechi: 462.27 lei
-8% Nou
Puncte Express: 638
Preț estimativ în valută:
81.39€ • 84.25$ • 68.79£
81.39€ • 84.25$ • 68.79£
Carte disponibilă
Livrare economică 13-27 februarie
Livrare express 29 ianuarie-04 februarie pentru 56.54 lei
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780415720779
ISBN-10: 041572077X
Pagini: 640
Ilustrații: 126 black & white illustrations, 179 black & white tables
Dimensiuni: 174 x 246 x 29 mm
Greutate: 1.18 kg
Ediția:New.
Editura: CRC Press
Colecția Routledge
ISBN-10: 041572077X
Pagini: 640
Ilustrații: 126 black & white illustrations, 179 black & white tables
Dimensiuni: 174 x 246 x 29 mm
Greutate: 1.18 kg
Ediția:New.
Editura: CRC Press
Colecția Routledge
Public țintă
Professional, Professional Practice & Development, and UndergraduateCuprins
Part 1: Introduction 1. Cost management 2. Cost estimating and cost planning Part 2: Order of cost estimating 3. Order of cost estimates – an overview 4. Embarking on an order of cost estimate 5. Preparing an order of cost estimate 6. Computing the works cost estimate 7. Order of cost estimate – a worked example 8. Preparation of an initial elemental cost model – using the elemental method of estimating 9. Initial elemental cost model – a worked example Part 3: Cost planning 10. Cost planning – an overview 11. Form, structure and codification of a cost plan 12. Preparation of a cost plan 13. Quantification and the use of the tabulated rules of measurement for cost planning 14. Facilitating works (group element 0) 15. Substructure (group element 1) 16. Superstructure (group element 2) 17. Internal finishes (group element 3) 18. Fittings, furniture and equipment (group element 4) 19. Services (group element 5) 20. Prefabricated buildings and building units (group element 6) 21. Work to existing buildings (group element 7) 22. External works (group element 8) 23. Deriving unit rates for building components, sub-elements and elements 24. Calculation of building works estimate 25. Main contractor’s preliminaries (group element 9) 26. Main contractor’s overheads and profit (group element 10) 27. Calculation of works cost estimate Part 4: Estimating cost targets for non-building works items and risk allowances 28. Project and design team fees (group element 11) 29. Other development and project costs (group element 12) 30. Setting and managing risk allowances (group element 13) 31. Estimating the possible effects of inflation (group element 14) 32. Establishing the cost limit 33. Taxes and incentives Part 5: Writing cost estimates and cost plan reports 34. Reporting of cost estimate and cost plans Part 6: Designing pricing documents using NRM 1 35. Pricing documents Part 7: Analysing bids and collecting cost data 36. Analysing bids and collecting cost data using NRM 1
Descriere
This is the definitive guide to measurement and estimating using NRM1, written by the author of NRM1 himself.