Performance Analysis of Manufacturing Systems: Springer Series in Operations Research and Financial Engineering
Autor Tayfur Altioken Limba Engleză Hardback – 13 dec 1996
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 587.72 lei 6-8 săpt. | |
Springer – 30 oct 2012 | 587.72 lei 6-8 săpt. | |
Hardback (1) | 737.43 lei 6-8 săpt. | |
Springer – 13 dec 1996 | 737.43 lei 6-8 săpt. |
Din seria Springer Series in Operations Research and Financial Engineering
- 17% Preț: 503.65 lei
- 17% Preț: 370.05 lei
- Preț: 497.00 lei
- Preț: 347.47 lei
- 13% Preț: 355.74 lei
- 15% Preț: 365.75 lei
- 17% Preț: 363.07 lei
- Preț: 356.90 lei
- 19% Preț: 575.59 lei
- 15% Preț: 638.43 lei
- 18% Preț: 740.57 lei
- 18% Preț: 945.30 lei
- 20% Preț: 639.27 lei
- Preț: 384.48 lei
- 23% Preț: 732.06 lei
- 18% Preț: 1395.63 lei
- Preț: 407.98 lei
- Preț: 358.39 lei
- 20% Preț: 549.57 lei
- 15% Preț: 660.37 lei
- Preț: 411.67 lei
- Preț: 391.02 lei
- 18% Preț: 898.13 lei
- Preț: 405.06 lei
- Preț: 495.84 lei
- 19% Preț: 526.95 lei
- Preț: 391.02 lei
- Preț: 392.97 lei
- 15% Preț: 538.61 lei
- 15% Preț: 880.15 lei
- 24% Preț: 831.83 lei
- 18% Preț: 788.09 lei
- 18% Preț: 801.65 lei
- 15% Preț: 637.28 lei
- 19% Preț: 529.47 lei
- Preț: 391.42 lei
Preț: 737.43 lei
Preț vechi: 899.30 lei
-18% Nou
Puncte Express: 1106
Preț estimativ în valută:
141.14€ • 146.80$ • 118.28£
141.14€ • 146.80$ • 118.28£
Carte tipărită la comandă
Livrare economică 13-27 martie
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780387947730
ISBN-10: 0387947736
Pagini: 372
Ilustrații: XI, 355 p.
Dimensiuni: 155 x 235 x 26 mm
Greutate: 0.73 kg
Ediția:1997
Editura: Springer
Colecția Springer
Seria Springer Series in Operations Research and Financial Engineering
Locul publicării:New York, NY, United States
ISBN-10: 0387947736
Pagini: 372
Ilustrații: XI, 355 p.
Dimensiuni: 155 x 235 x 26 mm
Greutate: 0.73 kg
Ediția:1997
Editura: Springer
Colecția Springer
Seria Springer Series in Operations Research and Financial Engineering
Locul publicării:New York, NY, United States
Public țintă
GraduateCuprins
1. Introduction to the Modeling of Manufacturing Systems.- 1.1. Typical Decision Problems in Manufacturing Systems.- 1.2. Performance Evaluation.- 1.3. Models of Manufacturing Systems.- 1.4. Design of Manufacturing Systems.- 2. Tools of Probability.- 2.1. Random Variables and Their Distributions.- 2.2. Joint Distributions.- 2.3. Conditional Distributions.- 2.4. Functions of Random Variables.- 2.5. Moments of Random Variables.- 2.6. Special Distributions.- 2.7. Stochastic Processes.- 2.8. Phase-Type Distributions.- 3. Analysis of Single Work Stations.- 3.1. Introduction.- 3.2. A Simple Work Station.- 3.3. Distribution of the Number in the System.- 3.4. Work Stations Subject to Failures.- 3.5. Distribution of the Number of Jobs in a Work Station Subject to Failures.- 3.6. The Process-Completion Time.- 3.7. Failure-Repair Policies.- 3.8. The Machine Interference Problem.- 4. Analysis of Flow Lines.- 4.1. Introduction.- 4.2. Characteristics of Flow Lines.- 4.3. Analysis of Two-Station Flow Lines.- 4.4. Analysis of Flow Lines With More Than Two Stations.- 4.5. Deterministic Processing Times.- 4.6. Bounds on the Output Rate.- 4.7. Design Problems in Flow Lines.- 5. Analysis of Transfer Lines.- 5.1. Introduction.- 5.2. A Two-Station Line with No Intermediate Buffer: A Regenerative Approach.- 5.3. Transfer Lines with Work-in-Process Buffers.- 5.4. Buffer Clearing Policies in Transfer Lines.- 5.5. Analysis of a Two-Machine Synchronous Line Under BCP1.- 5.6. Operation Under BCP2.- 5.7. Line Behavior and Design Issues.- 5.8. Analysis of Larger Systems.- 5.9. Transfer Lines with No Scrapping.- 6. Assembly Systems.- 6.1. Introduction.- 6.2. An Asynchronous Assembly System.- 6.3. Approximate Analysis of the Two-Station Assembly System.- 6.4. Analysis of Larger Systems.- 6.5. Synchronous Assembly Systems.- 6.6. Relaxing the Assembly Assumption.- 7. Pull-Type Manufacturing Systems.- 7.1. Introduction.- 7.2. Production Control Policies.- 7.3. Analysis of Single-Stage, Single-Product Systems.- 7.4. A Single-Stage System with Two Products.- 7.5. Multistage Pull-Type Systems.- 7.6. The Generalized Kanban Scheme.- 7.7. Manufacturing Systems with Inventory Procurement.- 7.8. A Two-Stage, MultiProduct System.- 7.9. The Look-Back Policy.