Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control
Autor Mario Vanhouckeen Limba Engleză Paperback – 27 aug 2016
In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) andconsultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.
The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 888.57 lei 38-44 zile | |
Springer Berlin, Heidelberg – 27 aug 2016 | 888.57 lei 38-44 zile | |
Hardback (1) | 899.00 lei 38-44 zile | |
Springer Berlin, Heidelberg – 11 dec 2013 | 899.00 lei 38-44 zile |
Preț: 888.57 lei
Preț vechi: 1169.18 lei
-24% Nou
Puncte Express: 1333
Preț estimativ în valută:
170.05€ • 179.84$ • 141.85£
170.05€ • 179.84$ • 141.85£
Carte tipărită la comandă
Livrare economică 27 decembrie 24 - 02 ianuarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9783662521373
ISBN-10: 3662521377
Pagini: 336
Ilustrații: XVIII, 318 p. 123 illus.
Dimensiuni: 155 x 235 x 18 mm
Greutate: 0.47 kg
Ediția:Softcover reprint of the original 2nd ed. 2013
Editura: Springer Berlin, Heidelberg
Colecția Springer
Locul publicării:Berlin, Heidelberg, Germany
ISBN-10: 3662521377
Pagini: 336
Ilustrații: XVIII, 318 p. 123 illus.
Dimensiuni: 155 x 235 x 18 mm
Greutate: 0.47 kg
Ediția:Softcover reprint of the original 2nd ed. 2013
Editura: Springer Berlin, Heidelberg
Colecția Springer
Locul publicării:Berlin, Heidelberg, Germany
Cuprins
Preface.- I Scheduling without resources.- II Scheduling with resources.- III Project control.- IV Scheduling with software.- V Conclusions.- Index.
Recenzii
From the reviews of the second edition:
“This book is brought in such a way that it is able to inform a wide audience about the current state-of-the-art principles in dynamic project scheduling. The target audience can consist of undergraduate or MBA students following a project management course, participants of company trainings with a focus on scheduling or software users who search for added value when using software tools. … I recommend this book as a compliment to your project management studies and especially for those already working in this area.” (Inspire and Action blog, inspireandaction.wordpress.com, December, 2013)
“This book is brought in such a way that it is able to inform a wide audience about the current state-of-the-art principles in dynamic project scheduling. The target audience can consist of undergraduate or MBA students following a project management course, participants of company trainings with a focus on scheduling or software users who search for added value when using software tools. … I recommend this book as a compliment to your project management studies and especially for those already working in this area.” (Inspire and Action blog, inspireandaction.wordpress.com, December, 2013)
Textul de pe ultima copertă
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on.
In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.
The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".
The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".
Caracteristici
Overview of project scheduling principles available in literature Integration of scheduling, risk and control Use of software stimulated (students version available) Topics based on many research projects and real-life projects Includes supplementary material: sn.pub/extras