Cantitate/Preț
Produs

Shield Tunnel Cutter Replacement Technology: Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions

Autor Jian Chen, Fanlu Min
en Limba Engleză Paperback – 22 aug 2022
This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.
Citește tot Restrânge

Toate formatele și edițiile

Toate formatele și edițiile Preț Express
Paperback (1) 62379 lei  6-8 săpt.
  Springer Nature Singapore – 22 aug 2022 62379 lei  6-8 săpt.
Hardback (1) 87217 lei  6-8 săpt.
  Springer Nature Singapore – 21 aug 2021 87217 lei  6-8 săpt.

Preț: 62379 lei

Preț vechi: 73388 lei
-15% Nou

Puncte Express: 936

Preț estimativ în valută:
11938 12555$ 9944£

Carte tipărită la comandă

Livrare economică 03-17 ianuarie 25

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9789811641091
ISBN-10: 9811641099
Pagini: 308
Ilustrații: XXIII, 308 p. 247 illus., 154 illus. in color.
Dimensiuni: 155 x 235 mm
Greutate: 0.47 kg
Ediția:1st ed. 2022
Editura: Springer Nature Singapore
Colecția Springer
Seria Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions

Locul publicării:Singapore, Singapore

Cuprins

Introduction.- Cutting, Wear and Replacement of Cutting Tools During Shield Tunneling.- Conventional Cutterhead & Tool-Changing Under Normal Pressure Technology.- Normal Pressure Tool Change Technology Based on Basic Pressure and Changeable Knife Design.- Stabilization Technology and Tool Change Technology for Open Face with Pressure Open.- Other Special Tool Changing Techniques.

Notă biografică

​Jian Chen, professor-level senior engineer, Ph.D. at Ocean University of China. Deputy Chief Engineer and Chief Expert of China Railway 14th Bureau Group, a well-known domestic large shield expert, mainly engaged in technical management and scientific research of the large shield cross-river tunnel project. He was awarded the honorary title of "China Civil Engineering Zhan Tianyou Innovation Collective", "Mao Yisheng Railway Engineer", "Shandong Province Excellent Inventor", "Jiangsu Province Top Ten Staff Operation Law" and "Shandong Excellent Young Intellectuals". Successfully completed the construction of large-scale underwater tunnels such as the Nanjing Yangtze River Tunnel, the Yangzhou Slender West Lake Tunnel, and the Wuhan Metro Line 8 Cross-river Tunnel. The scientific and technological achievements of the research and development have reached international advanced and domestic leading level. He received 6 provincial and ministerial-level scientific and technologicalprogress first prizes, 2 second prizes; 1 national-level construction method, 5 provincial-level construction methods; 23 national patents authorized; 1 monograph published; published core and above scientific papers 14 Article.

Fanlu Min, Ph.D., associate professor of Hohai University, master tutor, visiting scholar of Hong Kong University of Science and Technology, selected as a “big scholar” program at Hohai University. He is mainly engaged in research and teaching of underwater shield tunnels, urban subways, and other aspects. He has presided over 5 vertical projects such as the National Natural Science Foundation of China and the National 973 Program Sub-project, and presided over or participated in the Nanjing Yangtze River Tunnel, the Nanjing Weisan Road Crossing River Tunnel, the Yangzhou Slender West Lake Tunnel, the South-to-North Water Transfer Middle Line, the Yellow River Tunnel, and the Wuhan River Crossing Subway. More than 10 large-diameter underwater shield tunnels and technological innovations in urban subways. He won the first prize of provincial and ministerial level scientific and technological progress award; authorized 16 invention patents; published 1 monograph; published more than 60 papers, including 30 SCI/EI papers.


Textul de pe ultima copertă

This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel.

Caracteristici

Introduces conventional cutter head atmospheric-tool changing technology Introduces normal pressure tool change technology based on atmospheric pressure changeable tool design Introduces stabilization technology and tool change technology for excavation face with pressure opening