Analyzing Uncertainty in Civil Engineering
Editat de Wolfgang Fellin, Heimo Lessmann, Michael Oberguggenberger, Robert Vieideren Limba Engleză Hardback – 8 oct 2004
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 942.44 lei 6-8 săpt. | |
Springer Berlin, Heidelberg – 13 oct 2010 | 942.44 lei 6-8 săpt. | |
Hardback (1) | 947.35 lei 6-8 săpt. | |
Springer Berlin, Heidelberg – 8 oct 2004 | 947.35 lei 6-8 săpt. |
Preț: 947.35 lei
Preț vechi: 1155.30 lei
-18% Nou
Puncte Express: 1421
Preț estimativ în valută:
181.33€ • 190.51$ • 152.39£
181.33€ • 190.51$ • 152.39£
Carte tipărită la comandă
Livrare economică 11-25 martie
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9783540222460
ISBN-10: 3540222464
Pagini: 256
Ilustrații: IX, 242 p.
Dimensiuni: 155 x 235 x 19 mm
Greutate: 0.5 kg
Ediția:2005
Editura: Springer Berlin, Heidelberg
Colecția Springer
Locul publicării:Berlin, Heidelberg, Germany
ISBN-10: 3540222464
Pagini: 256
Ilustrații: IX, 242 p.
Dimensiuni: 155 x 235 x 19 mm
Greutate: 0.5 kg
Ediția:2005
Editura: Springer Berlin, Heidelberg
Colecția Springer
Locul publicării:Berlin, Heidelberg, Germany
Public țintă
ResearchCuprins
Assessment of characteristic shear strength parameters of soil and its implication in geotechnical design.- Ambiguity of safety definition in geotechnical models.- The fuzziness and sensitivity of failure probabilities.- The mathematics of uncertainty: models, methods and interpretations.- Multi-parameter models: rules and computational methods for combining uncertainties.- Sensitivity analysis.- Difficulties related to numerical predictions of deformations.- FE ultimate load analyses of pile-supported pipelines - tackling uncertainty in a real design problem.- The Implications of Geotechnical Model Uncertainty for Construction Management.- Fuzzy, probabilistic and stochastic modelling of an elastically bedded beam.- Queueing models with fuzzy data in construction management.- Fuzzy models in geotechnical engineering and construction management.
Textul de pe ultima copertă
This volume addresses the issue of uncertainty in civil engineering from design to construction. Failures do occur in practice. Attributing them to a residual system risk or a faulty execution of the project does not properly cover the range of causes. A closer scrutiny of the adopted design, the engineering model, the data, the soil-construction-interaction and the model assumptions is required. Usually, the uncertainties in initial and boundary conditions are abundant. Current engineering practice often leaves these issues aside, despite the fact that new scientific tools have been developed in the past decades that allow a rational description of uncertainties of all kinds, from model uncertainty to data uncertainty. It is the aim of this volume to have a critical look at current engineering risk concepts in order to raise awareness of uncertainty in numerical computations, shortcomings of a strictly probabilistic safety concept, geotechnical models of failure mechanisms and their implications for construction management, execution, and the juristic question of responsibility. In addition, a number of the new procedures for modelling uncertainty are explained. The book is a result of a collaborate effort of mathematicians, engineers and construction managers who met regularly in a post graduate seminar at the University of Innsbruck during the past years.
Caracteristici
Critical survey of current and presentation of new risk concepts in engineering Mathematical scope spans from probabilistic to numerical problems Applications range from geo-engineering and structural mechanics to construction operation Includes supplementary material: sn.pub/extras