Effective Project Management Through Applied Cost and Schedule Control
Autor James Bent, Kenneth K. Humphreysen Limba Engleză Paperback – 23 sep 2019
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 445.41 lei 3-5 săpt. | +44.12 lei 5-11 zile |
CRC Press – 23 sep 2019 | 445.41 lei 3-5 săpt. | +44.12 lei 5-11 zile |
Hardback (1) | 1320.08 lei 6-8 săpt. | |
CRC Press – mai 1996 | 1320.08 lei 6-8 săpt. |
Preț: 445.41 lei
Preț vechi: 484.14 lei
-8% Nou
Puncte Express: 668
Preț estimativ în valută:
85.24€ • 88.54$ • 70.81£
85.24€ • 88.54$ • 70.81£
Carte disponibilă
Livrare economică 13-27 ianuarie 25
Livrare express 28 decembrie 24 - 03 ianuarie 25 pentru 54.11 lei
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780367401344
ISBN-10: 0367401347
Pagini: 476
Dimensiuni: 210 x 280 x 31 mm
Greutate: 1.11 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
ISBN-10: 0367401347
Pagini: 476
Dimensiuni: 210 x 280 x 31 mm
Greutate: 1.11 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
Public țintă
Academic and Professional Practice & DevelopmentCuprins
The relationship and impact of project skills: introduction and authors' mission statement; benchmarking - the technical core of TQM; the impact of personnel skills on company culture and bottom line. Cosy and schedule baselines: estimating keys - establishing a realistic baseline (typical and standard schedules); value management; economic evaluation in the process industries; keys to controlling and reducing environmental costs. Project control: contracting - front-end risks (key contract administration and cost-schedule considerations); cost and schedule trend analysis-forecasting of baselines; change control and risk analysis; range estimating; contracting - claims and extras (excluding genuine scope changes); managing small, shutdown, retrofit, or outrage projects; project closeout-lessons learned and historical data. Project management keys and interface: project management fundamentals - key elements; managing the feasibility study - pre-project planning; front-end planning and project organization (FEPPO); managing engineering-project control keys/interfaces; management procurement - project control keys/interfaces; managing construction-project control keys/interfaces.
Notă biografică
Bent, James; Humphreys, Kenneth K.
Descriere
This work outlines a state-of-the-art project control and trending programme, focusing on advanced applied-cost and schedule-control skills for all phases of a project at both owner and contractor level. It contains information on the three major aspects of the total project programme: the techniques and procedures utilized for a project; the experience and analytical ability of project personnel; and the commitment and teamwork of a project group.