Cantitate/Preț
Produs

Effective Project Management Through Applied Cost and Schedule Control

Autor James Bent, Kenneth K. Humphreys
en Limba Engleză Hardback – mai 1996
This work outlines a state-of-the-art project control and trending programme, focusing on advanced applied-cost and schedule-control skills for all phases of a project at both owner and contractor level. It contains information on the three major aspects of the total project programme: the techniques and procedures utilized for a project; the experience and analytical ability of project personnel; and the commitment and teamwork of a project group.
Citește tot Restrânge

Toate formatele și edițiile

Toate formatele și edițiile Preț Express
Paperback (1) 38030 lei  6-8 săpt. +10923 lei  7-13 zile
  CRC Press – 23 sep 2019 38030 lei  6-8 săpt. +10923 lei  7-13 zile
Hardback (1) 104704 lei  6-8 săpt.
  CRC Press – mai 1996 104704 lei  6-8 săpt.

Preț: 104704 lei

Preț vechi: 141040 lei
-26% Nou

Puncte Express: 1571

Preț estimativ în valută:
20039 21140$ 166100£

Carte tipărită la comandă

Livrare economică 02-16 ianuarie 25

Preluare comenzi: 021 569.72.76

Specificații

ISBN-13: 9780824797157
ISBN-10: 0824797159
Pagini: 476
Dimensiuni: 210 x 280 x 32 mm
Greutate: 1.04 kg
Ediția:New.
Editura: CRC Press
Colecția CRC Press

Public țintă

Academic and Professional Practice & Development

Cuprins

The relationship and impact of project skills: introduction and authors' mission statement; benchmarking - the technical core of TQM; the impact of personnel skills on company culture and bottom line. Cosy and schedule baselines: estimating keys - establishing a realistic baseline (typical and standard schedules); value management; economic evaluation in the process industries; keys to controlling and reducing environmental costs. Project control: contracting - front-end risks (key contract administration and cost-schedule considerations); cost and schedule trend analysis-forecasting of baselines; change control and risk analysis; range estimating; contracting - claims and extras (excluding genuine scope changes); managing small, shutdown, retrofit, or outrage projects; project closeout-lessons learned and historical data. Project management keys and interface: project management fundamentals - key elements; managing the feasibility study - pre-project planning; front-end planning and project organization (FEPPO); managing engineering-project control keys/interfaces; management procurement - project control keys/interfaces; managing construction-project control keys/interfaces.

Notă biografică

Bent, James; Humphreys, Kenneth K.

Descriere

This work outlines a state-of-the-art project control and trending programme, focusing on advanced applied-cost and schedule-control skills for all phases of a project at both owner and contractor level. It contains information on the three major aspects of the total project programme: the techniques and procedures utilized for a project; the experience and analytical ability of project personnel; and the commitment and teamwork of a project group.