Pharmaceutical Engineering Change Control
Editat de Simon G. Turneren Limba Engleză Hardback – 15 dec 2003
Toate formatele și edițiile | Preț | Express |
---|---|---|
Paperback (1) | 368.14 lei 6-8 săpt. | |
CRC Press – 23 sep 2019 | 368.14 lei 6-8 săpt. | |
Hardback (1) | 980.56 lei 6-8 săpt. | |
CRC Press – 15 dec 2003 | 980.56 lei 6-8 săpt. |
Preț: 980.56 lei
Preț vechi: 1328.47 lei
-26% Nou
Puncte Express: 1471
Preț estimativ în valută:
187.67€ • 197.98$ • 156.39£
187.67€ • 197.98$ • 156.39£
Carte tipărită la comandă
Livrare economică 02-16 ianuarie 25
Preluare comenzi: 021 569.72.76
Specificații
ISBN-13: 9780849320613
ISBN-10: 0849320615
Pagini: 200
Ilustrații: 34 black & white illustrations
Dimensiuni: 156 x 234 x 17 mm
Greutate: 0.42 kg
Ediția:2 Rev ed.
Editura: CRC Press
Colecția CRC Press
ISBN-10: 0849320615
Pagini: 200
Ilustrații: 34 black & white illustrations
Dimensiuni: 156 x 234 x 17 mm
Greutate: 0.42 kg
Ediția:2 Rev ed.
Editura: CRC Press
Colecția CRC Press
Public țintă
Academic and Professional Practice & DevelopmentCuprins
Written especially for the pharmaceutical industry professional, this book addresses each part of the life-cycle of engineering change control. The author covers issues in the EU and US and describes the operational requirements and responsibilities that ensure change controls are effectively applied and recorded. Providing guidance on how to demonstrate that a change control system is working, the book includes chapters on computer validation and customization of the change process to each project's needs. Case histories and anecdotes illustrate key points and provide a basis for change control training. The book gives readers a toolbox for ensuring that adequate controls are implemented.
Descriere
Written especially for the pharmaceutical industry professional, this book addresses each part of the life-cycle of engineering change control. The author covers issues in the EU and US and describes the operational requirements and responsibilities that ensure change controls are effectively applied and recorded. Providing guidance on how to demonstrate that a change control system is working, the book includes chapters on computer validation and customization of the change process to each project's needs. Case histories and anecdotes illustrate key points and provide a basis for change control training. The book gives readers a toolbox for ensuring that adequate controls are implemented.